Publications

Filter
Topic
Publication State
Showing 1 - 7 of 7 Publications
Guide to Project Delivery Part 2: Planning and Control
Guide to Project Delivery consists of five parts. Part 2 gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase, as opposed to the preceding initiation phase and subsequent…
Extractions of Bituminous Binder from Asphalt
  • AGPT-T191-15 Superseded
  • 30 Jan 2015
  • Pavement
This method has been developed for extracting bituminous binders from bituminous mixtures i.e. asphalt field samples, loose plant mix or reclaimed asphalt pavement.
Characterisation of the Viscosity of Reclaimed Asphalt Pavement (RAP) Binder Using the Dynamic Shear Rheometer (DSR)
This test method sets out the procedure for the determination of viscosity of binders recovered from RAP source materials, as well as of virgin binders and rejuvenators. The viscosity is determined under specific conditions of oscillation loading,…
Guide to Project Delivery Part 1: Overview
The Austroads Guide to Project Delivery consists of four parts. Project delivery in a general sense may be described as the process by which the aim or goal of a project is realised or achieved. This part (Part 1) of the Guide explains the context…
Guide to Project Delivery Part 4: Direct Management of Construction
This document outlines appropriate standards of practice and procedures for the delivery of works by direct management. It assumes that the organisation has a commitment to undertake works using a direct management workforce with appropriate…
Guide to Project Delivery Part 1: Overview
The Austroads Guide to Project Delivery consists of four parts. Project delivery in a general sense may be described as the process by which the aim or goal of a project is realised or achieved.
Guide to Project Delivery Part 2: Project Delivery Planning and Control
This document gives guidance to project delivery practitioners on a number of concepts relating to planning and control of the delivery phase as opposed to the preceding initiation phase and subsequent operational phase of a project. It covers a…