Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Active Travel
Asset Management
Economics and Financing
Environment
Materials
Network
Pavement
Planning
Project Delivery
Road Design
Road Safety
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Guides
13
Research Reports
31
Specifications
1
Technical Reports
68
Test Methods
8
Webinars
29
Webinars and Events
1
Work Tips
28
Topic
Topic
Active travel
208
Aggregates
195
Annual reports
194
Asphalt
Automated vehicle policy
197
Automated vehicle safety
206
Bicycles
229
Binders
226
Binders test methods
202
Bitumen
240
Bituminous mixes test methods
202
Bridge assessment
271
Bridge components
238
Bridge construction
335
Bridge design
452
Bridge maintenance
288
Bridge management
295
Bridge materials
295
Bridge performance
248
Bridgeworks specifications
227
Capability assessment
193
Cemented materials
191
Climate change
192
Community attitudes
192
Concrete
258
Congestion
195
Contracts
189
Cooperative ITS
210
Crash analysis
233
Data management
252
Design principles and process
202
Digital infrastructure
186
Drainage
194
Driver licensing
218
Drugs and alcohol
193
Economic evaluation
232
Electric vehicles
193
Equipment test methods
205
Financing
197
Freight modelling
195
Freight policy
211
Geometric design
200
Granular materials
201
Guide review
208
Heavy vehicle access
252
Heavy vehicle safety
226
Heavy vehicle weighing
196
Incident management
197
Intelligent transport systems
208
Intersection design
Land use
190
Level of service
200
Materials testing
272
Motorcycles
190
Network management
227
Network operations
208
Network performance
197
Older drivers
191
Other assets management
199
Pavement construction
201
Pavement design
287
Pavement investigation test methods
201
Pavement maintenance
217
Pavement management
278
Pavement performance
351
Pavements specifications
198
Pedestrians
234
Performance based standards
192
Process and documentation
191
Procurement
186
Project governance
185
Project planning
Public transport
204
Rail bridges
211
Recycled material
194
Road pricing
189
Roadside design
200
Rural and remote
209
Safe people
242
Safe roads
285
Safe System
230
Safe vehicles
224
Safety audit
194
Safety strategy
206
Seals
242
Speed management
224
Steel
207
Strategic asset management
225
Structures management
213
Temporary traffic management
203
Traffic and safety
193
Traffic controls
219
Traffic management
230
Traffic modelling
201
Traffic operations
198
Traffic theories and studies
191
Transport planning
203
Tunnel design
200
Tunnel operations
195
Tunnel safety
201
Year
Year
2024
7
2023
26
2022
18
2021
24
2020
9
2019
5
2018
2
2017
5
2016
3
2015
4
2014
6
2013
13
2012
3
2011
7
2010
8
2009
4
2008
8
2007
5
2006
7
2004
5
2003
2
2002
3
2001
4
1998
1
Publication State
Publication State
Archived
24
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 179 Publications
Asphalt
Remove Asphalt filter
Intersection design
Remove Intersection design filter
Project planning
Remove Project planning filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
WEB-R708-24
8 Apr 2024
Pavement
More
Moisture damage in asphalt (also known as stripping) can significantly reduce the durability and strength of asphalt pavements, often resulting in expensive repairs. Hydrated lime is widely used in Australia to reduce the moisture susceptibility of…
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
WEB-T376-24
4 Apr 2024
Pavement
More
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
AP-R708-24
3 Apr 2024
Pavement
More
Hydrated lime is widely used in Australia to reduce the moisture susceptibility of asphalt mixes in service. However, the local asphalt industry is concerned about the sustainability of the continued use of hydrated lime in asphalt. This report…
Validation of Superpave™ Method of Asphalt Compaction for Australasia
AP-T376-24
3 Apr 2024
Pavement
More
This report details the testing of 21 Austroads jurisdictions mixes and one airport mix to develop a relationship between the Austroads Gyropac Gyratory compactor, which is now redundant, and the Servopac (setup to AS/NZS) and Superpave Gyratory…
Webinar: Optimising Project Delivery Performance – Accelerated Projects
WEB-R706-23
27 Feb 2024
Project Delivery
More
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Optimising Project Delivery Performance (Accelerated Projects)
AP-R706-24
29 Jan 2024
Project Delivery
More
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
1
2
3
4
5
Next
Latest news
3 Jun 2024
Austroads Safety Hardware Training and Accreditation Scheme Mandatory 1 July
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No