Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Economics and Financing
Environment
Freight
Materials
Network
Pavement
Planning
Project Delivery
Road Design
Road Safety
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Guides
9
Research Reports
30
Specifications
1
Technical Reports
71
Test Methods
8
Webinars
25
Webinars and Events
1
Work Tips
28
Topic
Topic
Active travel
204
Aggregates
189
Annual reports
188
Asphalt
Automated vehicle policy
191
Automated vehicle safety
200
Bicycles
229
Binders
220
Binders test methods
198
Bitumen
234
Bituminous mixes test methods
196
Bridge assessment
263
Bridge components
232
Bridge construction
329
Bridge design
446
Bridge maintenance
281
Bridge management
288
Bridge materials
289
Bridge performance
240
Bridgeworks specifications
221
Capability assessment
187
Cemented materials
185
Climate change
186
Community attitudes
182
Concrete
252
Congestion
189
Contracts
183
Cooperative ITS
204
Crash analysis
229
Data management
244
Design principles and process
198
Digital infrastructure
180
Drainage
188
Driver licensing
212
Drugs and alcohol
187
Economic evaluation
226
Electric vehicles
187
Equipment test methods
199
Financing
191
Freight modelling
188
Freight policy
205
Geometric design
205
Granular materials
195
Guide review
207
Heavy vehicle access
243
Heavy vehicle safety
221
Heavy vehicle weighing
190
Incident management
191
Intelligent transport systems
200
Intersection design
200
Land use
184
Level of service
Materials testing
266
Motorcycles
184
Network management
220
Network operations
201
Network performance
191
Older drivers
185
Other assets management
193
Pavement construction
195
Pavement design
281
Pavement investigation test methods
195
Pavement maintenance
211
Pavement management
269
Pavement performance
345
Pavements specifications
192
Pedestrians
231
Performance based standards
186
Process and documentation
185
Procurement
180
Project governance
179
Project planning
Public transport
195
Rail bridges
205
Recycled material
188
Road pricing
183
Roadside design
195
Rural and remote
201
Safe people
236
Safe roads
284
Safe System
227
Safe vehicles
218
Safety audit
188
Safety strategy
200
Seals
236
Speed management
222
Steel
201
Strategic asset management
217
Structures management
206
Temporary traffic management
197
Traffic and safety
189
Traffic controls
215
Traffic management
226
Traffic modelling
195
Traffic operations
194
Traffic theories and studies
185
Transport planning
197
Tunnel design
194
Tunnel operations
189
Tunnel safety
195
Year
Year
2024
7
2023
16
2022
18
2021
22
2020
8
2019
7
2018
5
2017
2
2016
6
2015
3
2014
5
2013
13
2012
4
2011
5
2010
6
2009
4
2008
9
2007
7
2006
11
2004
4
2003
2
2002
3
2001
4
2000
1
1998
1
Publication State
Publication State
Archived
10
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 173 Publications
Asphalt
Remove Asphalt filter
Level of service
Remove Level of service filter
Project planning
Remove Project planning filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
WEB-R708-24
8 Apr 2024
Pavement
More
Moisture damage in asphalt (also known as stripping) can significantly reduce the durability and strength of asphalt pavements, often resulting in expensive repairs. Hydrated lime is widely used in Australia to reduce the moisture susceptibility of…
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
WEB-T376-24
4 Apr 2024
Pavement
More
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
AP-R708-24
3 Apr 2024
Pavement
More
Hydrated lime is widely used in Australia to reduce the moisture susceptibility of asphalt mixes in service. However, the local asphalt industry is concerned about the sustainability of the continued use of hydrated lime in asphalt. This report…
Validation of Superpave™ Method of Asphalt Compaction for Australasia
AP-T376-24
3 Apr 2024
Pavement
More
This report details the testing of 21 Austroads jurisdictions mixes and one airport mix to develop a relationship between the Austroads Gyropac Gyratory compactor, which is now redundant, and the Servopac (setup to AS/NZS) and Superpave Gyratory…
Webinar: Optimising Project Delivery Performance – Accelerated Projects
WEB-R706-23
27 Feb 2024
Project Delivery
More
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Optimising Project Delivery Performance (Accelerated Projects)
AP-R706-24
29 Jan 2024
Project Delivery
More
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No