Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Active Travel
Asset Management
Bridges
Connected and Automated Vehicles
Economics and Financing
Environment
Low and Zero Emission Vehicles
Materials
Network
Pavement
Planning
Road Design
Road Safety
Temporary Traffic Management
Test Methods and Specifications
Traffic Management
Tunnels
Search publications library
Filter
Open/Close All Filters
Type
Type
Guides
20
Research Reports
48
Specifications
1
Technical Reports
78
Test Methods
9
Webinars
35
Webinars and Events
1
Work Tips
28
Topic
Topic
Active travel
250
Aggregates
236
Annual reports
235
Asphalt
Automated vehicle policy
236
Automated vehicle safety
241
Bicycles
275
Binders
267
Binders test methods
245
Bitumen
281
Bituminous mixes test methods
243
Bridge assessment
312
Bridge components
277
Bridge construction
374
Bridge design
491
Bridge maintenance
330
Bridge management
337
Bridge materials
336
Bridge performance
287
Bridgeworks specifications
268
Capability assessment
232
Cemented materials
232
Climate change
232
Community attitudes
232
Concrete
299
Congestion
235
Contracts
231
Cooperative ITS
251
Crash analysis
274
Data management
282
Design principles and process
247
Digital infrastructure
230
Drainage
235
Driver licensing
259
Drugs and alcohol
234
Economic evaluation
271
Electric vehicles
232
Equipment test methods
246
Financing
235
Freight modelling
236
Freight policy
252
Geometric design
252
Granular materials
242
Guide review
254
Heavy vehicle access
290
Heavy vehicle safety
268
Heavy vehicle weighing
237
Incident management
236
Intelligent transport systems
249
Intersection design
247
Land use
231
Level of service
241
Materials testing
313
Motorcycles
231
Network management
265
Network operations
249
Network performance
238
Older drivers
232
Other assets management
235
Pavement construction
242
Pavement design
328
Pavement investigation test methods
242
Pavement maintenance
256
Pavement management
315
Pavement performance
392
Pavements specifications
239
Pedestrians
277
Performance based standards
233
Process and documentation
234
Procurement
232
Project governance
232
Project planning
238
Public transport
243
Rail bridges
252
Recycled material
235
Road pricing
230
Roadside design
242
Rural and remote
251
Safe people
282
Safe roads
323
Safe System
271
Safe vehicles
265
Safety audit
235
Safety strategy
245
Seals
283
Speed management
262
Steel
248
Strategic asset management
Structures management
252
Temporary traffic management
241
Traffic and safety
232
Traffic controls
Traffic management
267
Traffic modelling
240
Traffic operations
238
Traffic theories and studies
232
Transport planning
243
Tunnel design
241
Tunnel operations
234
Tunnel safety
240
Year
Year
2024
5
2023
15
2022
19
2021
33
2020
14
2019
5
2018
27
2017
3
2016
3
2015
5
2014
5
2013
15
2012
6
2011
7
2010
9
2009
6
2008
8
2007
6
2006
12
2004
4
2003
2
2002
7
2001
3
1998
1
Publication State
Publication State
Archived
21
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 220 Publications
Asphalt
Remove Asphalt filter
Strategic asset management
Remove Strategic asset management filter
Traffic controls
Remove Traffic controls filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
WEB-R708-24
8 Apr 2024
Pavement
More
Moisture damage in asphalt (also known as stripping) can significantly reduce the durability and strength of asphalt pavements, often resulting in expensive repairs. Hydrated lime is widely used in Australia to reduce the moisture susceptibility of…
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
WEB-T376-24
4 Apr 2024
Pavement
More
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Feasibility of Using Anti-stripping Additives as an Alternative to Hydrated Lime
AP-R708-24
3 Apr 2024
Pavement
More
Hydrated lime is widely used in Australia to reduce the moisture susceptibility of asphalt mixes in service. However, the local asphalt industry is concerned about the sustainability of the continued use of hydrated lime in asphalt. This report…
Validation of Superpave™ Method of Asphalt Compaction for Australasia
AP-T376-24
3 Apr 2024
Pavement
More
This report details the testing of 21 Austroads jurisdictions mixes and one airport mix to develop a relationship between the Austroads Gyropac Gyratory compactor, which is now redundant, and the Servopac (setup to AS/NZS) and Superpave Gyratory…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No