Publications

Filter
Topic
Publication State
Showing 1 - 10 of 325 Publications
Webinar: Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
Join us for a webinar that delves into the latest on connected and automated vehicles (CAVs) and the pivotal role that interaction with physical infrastructure plays in their integration into our transport system. In this session, we will present a…
Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
This report identifies and discusses physical infrastructure practices that Austroads member agencies could change to improve connected and automated vehicle (CAV) support. It incorporates a review of previous Austroads publications that…
Guidelines for the trials of automated vehicles in Australia 2023
These guidelines set out criteria that must be addressed in any application for an automated vehicle trial. The guidelines aim to provide clear guidance on matters that should be addressed by trialling organisations as part of the trialling process…
Guidelines for the Evaluation and Reporting of Automated Vehicle Trials
These guidelines set out the key stages associated with evaluation and reporting of automated vehicle trials including: scoping and planning
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
New methods for match cast segmental construction in Australia on the Grafton Bridge
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…