Publications

Filter
Topic
Publication State
Showing 1 - 10 of 101 Publications
Optimising Project Delivery Performance (Accelerated Projects)
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Webinar: Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
Join us for a webinar that delves into the latest on connected and automated vehicles (CAVs) and the pivotal role that interaction with physical infrastructure plays in their integration into our transport system. In this session, we will present a…
Minimum Requirements for Traffic Signs, Traffic Signals and Line Markings
This report identifies and discusses physical infrastructure practices that Austroads member agencies could change to improve connected and automated vehicle (CAV) support. It incorporates a review of previous Austroads publications that…
Guidelines for the trials of automated vehicles in Australia 2023
These guidelines set out criteria that must be addressed in any application for an automated vehicle trial. The guidelines aim to provide clear guidance on matters that should be addressed by trialling organisations as part of the trialling process…
Guidelines for the Evaluation and Reporting of Automated Vehicle Trials
These guidelines set out the key stages associated with evaluation and reporting of automated vehicle trials including: scoping and planning
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Code of Practice for the Management of Alkali Aggregate Reactivity Template
The Code of Practice for the Management of Alkali Aggregate Reactivity template has been developed for the use of Austroads member agencies. The document outlines the management strategies, testing and approval process required to regulate alkali…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &