Publications

Filter
Topic
Publication State
Showing 1 - 5 of 5 Publications
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Interim Guidelines for the Use of Recycled Waste Plastic in Local Government Road Surfacing Applications
As a result of the ban on the export of recycled waste plastic, there is increasing interest in repurposing recycled waste plastic for use in road surfacing applications. There is no guide for this purpose and until such time as a guide is available…
Guide to Project Delivery Part 5: Road Construction Quality Assurance
Many of the shortcomings experienced in quality assured contracts reflect the way in which road agency requirements have been specified and administered. Emphasis has been placed on third party accredited quality systems, and not on the fundamentals…
Guide to Pavement Technology Part 4F: Bituminous Binders
Guide to Pavement Technology Part 4F: Bituminous Bindersprovides guidance on the use of bituminous materials in road construction and maintenance. Bituminous materials include bitumen obtained from refining crude petroleum oil and products derived…
Guide to Pavement Technology Part 4L: Stabilising Binders
Stabilisation may be defined as a process by which the intrinsic properties of a pavement material are altered by the addition of a stabilisation binder to meet performance expectations in its operating, geological and climatic environment. Part 4L…