Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Materials
Pavement
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Test Methods
14
Webinars
1
Topic
Topic
Active travel
18
Aggregates
18
Alcohol interlocks
16
Annual reports
16
Asphalt
23
Assessing Fitness to Drive
18
Automated vehicle policy
20
Automated vehicle safety
16
Bicycles
17
Binders
19
Binders test methods
Bitumen
23
Bituminous mixes test methods
Bridge assessment
48
Bridge barriers
17
Bridge components
32
Bridge construction
59
Bridge design
83
Bridge maintenance
48
Bridge management
39
Bridge materials
44
Bridge performance
34
Bridgeworks specifications
19
Capability assessment
17
Climate change
18
Concrete
21
Congestion
17
Contracts
17
Data management
22
Digital infrastructure
17
Drainage
18
Driver licensing
19
Drugs and alcohol
17
Earthworks
18
Economic evaluation
18
Electric vehicles
20
Freight modelling
17
Freight policy
17
Guide review
21
Heavy vehicle access
17
Heavy vehicle safety
17
Hydrogen vehicles
17
Incident management
17
Materials testing
21
Network management
18
Network operations
17
Older drivers
17
Pavement design
19
Pavement investigation test methods
16
Pavement maintenance
16
Pavement performance
21
Pavements specifications
18
Pedestrians
18
Prequalification
16
Procurement
17
Project governance
17
Project planning
20
Public transport
18
Recycled material
29
Roadside design
19
Rural and remote
16
Safe people
20
Safe roads
25
Safe System
18
Safe vehicles
17
Safety audit
18
Safety programs
16
Safety strategy
16
Seals
17
Smart motorways
17
Speed management
19
Stabilised materials
18
Strategic asset management
16
Structures management
16
Temporary traffic management
17
Traffic controls
20
Traffic management
18
Transport planning
16
Tunnel design
19
Tunnel operations
18
Tunnel safety
20
Year
Year
2023
22
2022
2021
19
2020
18
2019
19
2018
21
2017
16
2016
16
2015
16
2014
16
2010
17
2006
22
2005
20
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 15 Publications
Binders test methods
Remove Binders test methods filter
Bituminous mixes test methods
Remove Bituminous mixes test methods filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Webinar: Standards Australia – Bitumen and Related Materials for Roads
WEB-ASB-22
13 Sep 2022
Pavement
More
In Australia and New Zealand, bituminous binders used in road construction are tested prior to use to ensure they will perform satisfactorily during road construction/maintenance. Some of the Australian Standards that are used for these tests have…
Cone Penetration of Hot Poured Joint Sealant
ATM-284-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the cone penetration of a joint sealant at 25 
Flow Properties of Hot Poured Joint Sealant
ATM-281-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the resistance of hot poured joint sealants to flow at a temperature of 70 °
Preparation of Hot Poured Joint Sealant for Laboratory Testing
ATM-280-22
4 Aug 2022
Test Methods and Specifications
More
This test method sets out the procedure to be used to prepare joint sealant samples for testing.
Heat Degradation of Hot Poured Joint Sealant
ATM-283-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the degree to which a joint sealant is degraded by heat during prolonged storage (6 
Handling Viscosity of Polymer Modified Binders (Brookfield Thermosel)
ATM-111-22
26 Jul 2022
Pavement
More
This test method sets out the procedure for determining the apparent viscosity of PMBs at temperatures above 100°C, using the Brookfield Thermosel rotational viscometer.
Method of Sampling Polymer Modified Binders, Polymers and Crumb Rubber
ATM-101-22
26 Jul 2022
Pavement
More
This test method applies to polymer modified binders, polymers and crumb rubber.Materials are sampled according to this protocol to ensure that correct sampling procedures are followed and that test results provide the required information on…
Flash Point of Polymer Modified Binders
ATM-112-22
26 Jul 2022
Pavement
More
This test method sets out the procedure for the determination of the flash point of polymer modified binders (PMBs). This test method is applicable to PMBs used in the construction and maintenance of pavements (as specified in ATS 3110).
Compressive Limit of Polymer Modified Binders
ATM-132-22
26 Jul 2022
Pavement
More
This test method is applicable to all binders that do not have a viscous response at 70°C and at long loading times when confined to film thicknesses in the range 0.1 to 1mm. It is applicable to all modified binders.
Mass Change or Loss on Heating of Polymer Modified Binders after Rolling Thin Film Oven (RTFO) Treatment
ATM-103-22
26 Jul 2022
Pavement
More
This test method sets out the procedure for the determination of mass change or loss on heating of a polymer modified binder (PMB) due to the effect of heat and air during rolling thin film oven (RTFO) treatment.
1
2
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No