Publications

Filter
Topic
Publication State
Showing 1 - 5 of 5 Publications
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Guide to Pavement Technology Part 4D: Stabilised Materials
The use of stabilisation technology for stabilising and recycling materials for pavement construction and maintenance is widely accepted as a cost-effective method of improving long‑term performance and reducing whole-of-life costs of modern,…
Guide to Project Delivery Part 5: Road Construction Quality Assurance
Many of the shortcomings experienced in quality assured contracts reflect the way in which road agency requirements have been specified and administered. Emphasis has been placed on third party accredited quality systems, and not on the fundamentals…
Guide to Pavement Technology Part 4F: Bituminous Binders
Guide to Pavement Technology Part 4F: Bituminous Bindersprovides guidance on the use of bituminous materials in road construction and maintenance. Bituminous materials include bitumen obtained from refining crude petroleum oil and products derived…
Bituminous Materials Safety Guide
  • AP-G41-15 Edition: 4
  • 24 Feb 2015
  • Pavement
The Bituminous Materials Safety Guide describes safe working practices and disposal of waste materials to be used when handling hot bituminous products in sprayed sealing, asphalt and bituminous stabilisation operations.