Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
44
Test Methods
7
Webinars
1
Topic
Topic
Active travel
55
Aggregates
55
Alcohol interlocks
53
Annual reports
53
Asphalt
60
Assessing Fitness to Drive
55
Automated vehicle policy
57
Automated vehicle safety
53
Bicycles
54
Binders
56
Binders test methods
59
Bitumen
60
Bituminous mixes test methods
Bridge assessment
83
Bridge barriers
53
Bridge components
67
Bridge construction
Bridge design
89
Bridge maintenance
81
Bridge management
74
Bridge materials
74
Bridge performance
69
Bridgeworks specifications
56
Capability assessment
54
Climate change
55
Concrete
58
Congestion
54
Contracts
54
Data management
59
Digital infrastructure
54
Drainage
55
Driver licensing
56
Drugs and alcohol
54
Earthworks
55
Economic evaluation
55
Electric vehicles
57
Freight modelling
54
Freight policy
54
Guide review
58
Heavy vehicle access
54
Heavy vehicle safety
54
Hydrogen vehicles
54
Incident management
54
Materials testing
58
Network management
55
Network operations
54
Older drivers
54
Pavement design
56
Pavement investigation test methods
53
Pavement maintenance
53
Pavement performance
58
Pavements specifications
55
Pedestrians
55
Prequalification
53
Procurement
54
Project governance
54
Project planning
57
Public transport
55
Recycled material
66
Roadside design
56
Rural and remote
53
Safe people
57
Safe roads
62
Safe System
55
Safe vehicles
54
Safety audit
55
Safety programs
53
Safety strategy
53
Seals
54
Smart motorways
54
Speed management
56
Stabilised materials
55
Strategic asset management
53
Structures management
53
Temporary traffic management
54
Traffic controls
57
Traffic management
55
Transport planning
53
Tunnel design
56
Tunnel operations
55
Tunnel safety
57
Year
Year
2023
58
2022
2021
55
2020
57
2018
58
2017
92
2016
53
2014
78
2012
53
2011
85
2010
53
2006
56
2005
57
2003
53
2001
53
2000
54
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 52 Publications
Bituminous mixes test methods
Remove Bituminous mixes test methods filter
Bridge construction
Remove Bridge construction filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
New methods for match cast segmental construction in Australia on the Grafton Bridge
ABC2022-096-22
18 Nov 2022
Bridges
More
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
ABC2022-084-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…
Effects of increasing Limestone content of cement on concrete performance
ABC2022-052-22
18 Nov 2022
Bridges
More
In attempts to reduce the CO2 footprint of the construction industry, technologies have been developed in the past for the replacement of Portland cement by other materials, such as supplementary cementitious materials (SCMs), which have had the…
Granite Island Causeway Replacement Project
ABC2022-062-22
18 Nov 2022
Bridges
More
The Granite Island Causeway is a key piece of South Australian infrastructure of cultural and heritage significance. It is an iconic landmark for local tourism, used for the historic horse drawn tram services and for recreational pedestrian and…
Bridges of the West Gate Tunnel Project
ABC2022-025-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project is one of Australia's largest infrastructure projects currently under construction and will give Melbourne an alternative to the West Gate Bridge. The scope includes: Two three-lane road tunnels, Widening of the West…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No