Publications

Filter
Topic
Publication State
Showing 1 - 10 of 240 Publications
Austroads Extended Vehicle Classification Scheme for Traffic and Transport Surveys
Austroads extended vehicle classification scheme builds on the influential 1994 scheme. The extended scheme provides greater granularity across the 12 classes in the 1994 scheme. It also provides a new classes for: active transport to address the…
Multimodal Incident Management: Reference Architecture
This report presents a set of reference architecture models, content and guidance for use by road agencies to identify, plan and improve their Multimodal Incident Management (MMIM) capabilities. MMIM is defined as the resolution of an unplanned…
Webinar: Austroads National Harmonisation of Temporary Traffic Management Practice – Update
In this webinar, Chris Koniditsiotis, Lead Implementation Consultant and Patsy Thomas, National Temporary Traffic Management (TTM) Operations Manager provide an update on the implementation and operational commencement of the Austroads National…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Australasian Pedestrian Facility Selection Tool [V2.2.2]: User Guide
This user guide describes the operation and outputs of the Australasian Pedestrian Crossing Facility Selection Web Tool This guide describes the user interface of the tool, including: how to access the tool the types of facilities that can and…
Alice River Bridge Pier 4 Settlement - Investigation and Rehabilitation
In late 2019, a concerned driver reported significant settlement at the Alice River Bridge on the Landsborough Highway (Blackall ñ Barcaldine) in Queensland, Australia. This ten span 140 m long bridge was constructed circa 1976, with each pier…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Birkenhead Bridge Bascule Span Deck Replacement
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Existing Ballasted Rail Bridge Assessment - Benefits of a Rail Structure Interaction Analysis
A load rating was undertaken as part of the asset owners regular periodic load rating on a 139 m total length, 12-span bridge carrying a single ballasted rail track on curved horizontal and vertical alignment originally constructed in 1996. The…