Publications

Showing 1 - 7 of 7 Publications
The Revision of AS 5100.4: Bearings and Deck Joints
A major revision of AS 5100.4 Bearing and Deck Joints has been undertaken in preparation for the publication of a new edition of AS 5100. The major changes to Part 4 of the Standard include the introduction of provisions for modular deck joints and…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Inelastic Displacement-Based Seismic Design of Balanced Cantilever Bridges With Mid-Length Joints
Ideally, a balanced cantilever bridge is built with its superstructure continuous between the abutments. For long bridges, mid-length expansion joints may be necessary. The separation of expansion joints may be maximised by supporting the…
Anzac Cable Stayed Bridge Health Monitoring
Roads and Maritime Services of Transport for NSW in collaboration with the Bridge Solution Alliance formed by Freyssinet, Lend Lease and Sage Automation undertook a major maintenance project to solve stay cable vibrations, strengthening-related…
Modular Joint Testing for the Hunter Expressway
Modular bridge expansion joints (MBEJs) are widely used throughout the world for the provision of controlled pavement continuity during seismic, thermal expansion, contraction and long-term creep and shrinkage movements of bridge superstructures.…
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
West Gate Bridge: Refurbishment of Demag Expansion Joint and Roller Bearings
Melbourne’s West Gate Bridge, first opened to traffic in 1978, is around 2.5 km long and comprises an 848 m long five-span steel box girder portion over the Yarra River and two continuous concrete box girder approach viaducts 871 m and 670 m long.…