Publications

Filter
Topic
Publication State
Showing 1 - 10 of 66 Publications
Chloride Content of Soil
Austroads test method 710 describes the procedure for determining the chloride content of select backfill material intended for use in reinforced earth structures. Chloride content is determined by water extraction and titrimetric analysis of the…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
New methods for match cast segmental construction in Australia on the Grafton Bridge
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…
Modular Lightweight FRP Footbridges
Fibre reinforced polymer (FRP) footbridges were investigated by British Rail in the early 1980's due to the benefits of lightweight construction. FRP bridge applications have continued to be developed for railway infrastructure in the UK, including…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…