Publications

Filter
Topic
Publication State
Showing 1 - 10 of 201 Publications
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Guide to Pavement Technology Part 2: Pavement Structural Design
Guide to Pavement Technology Part 2: Pavement Structural Design provides advice for the structural design of sealed road pavements. The advice has been generally developed from the approaches followed by the Austroads member agencies. However, as it…
Webinar: Validation of Superpave™ Method of Asphalt Compaction for Australasia
Austroads has completed a project to replace the obsolete gyratory compactors used in design and quality control testing of asphalt mixes and update its Guide to Pavement Technology Part 4B: Asphalt. Austroads asphalt mix design procedure currently…
Webinar: National Harmonisation of Test Methods Used in Asphalt Performance Specifications
The asphalt industry is rapidly evolving, and it is widely accepted that prescriptive specifications are not necessarily well suited to take full advantage of the benefits that new and innovative technologies can provide. There is therefore a desire…
National Harmonisation of Test Methods Used in Asphalt Performance Specifications
This report documents the delivery of the first component of a new Austroads performance-related asphalt specification framework. This included the development of several new test methods and updating a number of existing test methods for use in…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…