Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Materials
Pavement
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
44
Guides
2
Research Reports
3
Technical Reports
4
Webinars
5
Topic
Topic
Active travel
61
Aggregates
58
Alcohol interlocks
59
Annual reports
59
Asphalt
64
Assessing Fitness to Drive
61
Automated vehicle policy
63
Automated vehicle safety
59
Bicycles
60
Binders
58
Binders test methods
65
Bitumen
63
Bituminous mixes test methods
66
Bridge assessment
89
Bridge barriers
59
Bridge components
73
Bridge construction
Bridge design
95
Bridge maintenance
87
Bridge management
80
Bridge materials
80
Bridge performance
75
Bridgeworks specifications
62
Capability assessment
60
Climate change
61
Concrete
58
Congestion
60
Contracts
60
Data management
65
Digital infrastructure
60
Drainage
58
Driver licensing
62
Drugs and alcohol
60
Earthworks
58
Economic evaluation
61
Electric vehicles
63
Freight modelling
60
Freight policy
60
Guide review
63
Heavy vehicle access
60
Heavy vehicle safety
60
Hydrogen vehicles
60
Incident management
60
Materials testing
64
Network management
61
Network operations
60
Older drivers
60
Pavement design
60
Pavement investigation test methods
59
Pavement maintenance
59
Pavement performance
59
Pavements specifications
60
Pedestrians
61
Prequalification
59
Procurement
60
Project governance
60
Project planning
63
Public transport
61
Recycled material
Roadside design
62
Rural and remote
59
Safe people
63
Safe roads
68
Safe System
61
Safe vehicles
60
Safety audit
61
Safety programs
59
Safety strategy
59
Seals
64
Smart motorways
60
Speed management
62
Stabilised materials
60
Strategic asset management
59
Structures management
59
Temporary traffic management
60
Traffic controls
63
Traffic management
61
Transport planning
59
Tunnel design
62
Tunnel operations
61
Tunnel safety
63
Year
Year
2023
64
2022
2021
68
2020
61
2019
60
2018
59
2017
98
2016
60
2014
84
2012
59
2011
92
2004
59
2003
59
2001
59
2000
61
Publication State
Publication State
Archived
1
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 58 Publications
Bridge construction
Remove Bridge construction filter
Recycled material
Remove Recycled material filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Passenger Cars and other Non-truck Tyres Crumb Rubber in Asphalt: National Market Analysis, Review of Industry Practices and Technology Transfer
AP-R681-22
15 Dec 2022
Pavement
More
This report provides a comprehensive overview of the fate of end-of-life tyres, the tyre recycling industry in Australia and New Zealand, the specifications for the use of crumb rubber in road applications and the potential benefits of other-than-…
Development of the Austroads Rejuvenator Evaluation Protocol
AP-T366-22
14 Dec 2022
Pavement
More
This report describes research into the development of a draft Austroads evaluation protocol for rejuvenators. Rejuvenators are typically used to produce asphalt mixes containing high levels of reclaimed asphalt pavement (RAP). The report includes a…
Webinar: Use of Road-grade Recycled Plastics for Sustainable Asphalt Pavements Part 3: Performance Outcomes Part B and Future Recyclability
WEB-R680-22
29 Nov 2022
Pavement
More
Austroads has completed its project APT6305 Use of Road-grade Recycled Plastics for Sustainable Asphalt Pavements which was investigating road-grade recycled plastics that can be used to construct and maintain asphalt roads. The project results are…
The Benefits of Using InQuik Accelerated Bridge Construction Systems
ABC2022-073-22
18 Nov 2022
Bridges
More
The InQuik Bridge System is an Australian innovation that was first conceptualized in 2015. Since its introduction into the market in 2017, it has been rapidly adopted in the Australian bridge market, with more than 160+ bridges in service or under…
Simple visualisation of projects using 360 Pano camera views embedded in project GIS portal for design development and stakeholder consultation
ABC2022-141-22
18 Nov 2022
Bridges
More
Visualisation tools are often used during concept development to assist in developing feasible options and also for further consultation with stakeholders and other interested parties to gain approval for further progression of the project.…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
ABC2022-110-22
18 Nov 2022
Bridges
More
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
ABC2022-069-22
18 Nov 2022
Bridges
More
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
ABC2022-037-22
18 Nov 2022
Bridges
More
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…
New methods for match cast segmental construction in Australia on the Grafton Bridge
ABC2022-096-22
18 Nov 2022
Bridges
More
The most easily recognisable landmark in the northern NSW town of Grafton is the Grafton Bridge. Spanning the mighty Clarence River, it links the CBD with the southern suburbs. However, this 90-year-old icon needed to be duplicated to meet the…
West Gate Tunnel Project - Mackenzie Road Interchange Bridges
ABC2022-084-22
18 Nov 2022
Bridges
More
The West Gate Tunnel Project involves the construction of twin tunnels under Yarraville to provide an alternative route to the West Gate Bridge. A major bridge over the Maribyrnong River connects the tunnels to a new elevated viaduct structure over…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No