Publications

Filter
Topic
Publication State
Showing 1 - 10 of 339 Publications
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Supply of Polymer Modified Binders
Austroads Technical Specification ATS 3110 sets out the requirements for the supply of polymer modified binders (PMBs) and crumb rubber modified binders for use in both sprayed sealing and asphalt applications. The technical specification can also…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Austroads Rejuvenator Evaluation Protocol for Increasing Asphalt Recycling
The use of reclaimed asphalt pavement (RAP) in new asphalt mixes is a common practice in Australia and New Zealand due to its many benefits. RAP contents are typically about 10&ndash
Development of the Austroads Rejuvenator Evaluation Protocol
This report describes research into the development of a draft Austroads evaluation protocol for rejuvenators. Rejuvenators are typically used to produce asphalt mixes containing high levels of reclaimed asphalt pavement (RAP). The report includes a…
Mitigating the risk of acidification in reinforced concrete bridge impressed current cathodic protection systems
One of the main remedial treatments for reinforced concrete structures such as bridges in marine environments is impressed current cathodic protection (ICCP). Many ICCP systems in marine environments have manifested backfill mortar deterioration due…
Innovative Incrementally Launched U-Trough Girder Viaduct for Challenging Site
The innovative Viaduct over Muscle Creek and Hunter River with an overall length of 178.4m comprises four spans of 45.7m by 50m by 50m by 29.7m and 1.5m length beyond the bearings at each abutment, to suit a challenging and restrictive site. The…
The design of asymmetric continuous twin U-trough rail viaduct with hybrid pre-stressing
Whiteman Park Viaduct is part of the new 21 km Morley-Ellenbrook Rail Line (MEL) from Bayswater to Ellenbrook, in the Perth Metropolitan area in Western Australia. The viaduct is required to elevate MEL at the Whiteman Park Station precinct to allow…
Longest weathering steel arch in Australia to carry light rail on the Parramatta Light Rail
Parramatta Light Rail Stage 1 project includes James Ruse Underbridge which carries two light rail tracks and a 3.75 m wide shared user path across James Ruse Drive. To clear this busy road and a future planned widening, a single span of 64 m…
Design and Construction of an Incrementally Launched Ramp for the Saar Interchange in Bahrain
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the improvement of the two highways included their junction, known as the…