Guidelines for Planning and Assessment of Road Freight Access in Industrial Areas
These guidelines have been developed to help councils plan and assess road freight access to industrial areas, including ensuring that infrastructure provided by developers is adequate to meet access needs for many years.
Evaluation and Strengthening of Existing Bridges to Carry Increased Vehicle Weights
Detailed investigation and live-load evaluation was undertaken for several 1930s reinforced concrete bridges followed by strengthening where required.
Upgrading NZ Bridges for High Productivity Motor Vehicles
New Zealand (NZ) has introduced High Productivity Motor Vehicles (HPMV’s) to improve freight efficiency on its road network. The significant increase in vehicle mass limits has required a national bridge load capacity evaluation and strengthening…
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
A New Vehicle Loading Standard for Road Bridges in New Zealand
With the progressive increase in heavy vehicle loadings associated with improved transport vehicle technology, the current vehicle loading standard for the design of bridges in New Zealand, first introduced in 1972, may not be appropriate for use in…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
The New AS 5100 Part 8: Rehabilitation and Strengthening
AS 5100 was originally developed for the design of new bridges. There are however, approximately 20,000 existing bridges in Australia. Although Part 7 of the Standard relates to the strength rating of existing bridges, the existing AS 5100 generally…
The New Zealand Transport Agency Guide to Bridge Painting
The New Zealand Transport Agency (Transport Agency) has recently published ‘Protective Coatings for Steel Bridges: A Guide for Bridge and Maintenance Engineers’. This was prepared by the authors to optimise the long-term capital and maintenance…
Climbing Robot for Steel Bridge Inspection: Engineering Challenges
Inspection of bridges often requires high-risk operations such as working at heights, in confined spaces, in hazardous environments, or sites inaccessible by humans. There is significant motivation for robotic solutions which can carry out these…
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…