Publications

Filter
Publication State
Showing 1 - 10 of 18 Publications
Validation of Revised Austroads Sprayed Seal Design Approaches: Site Inspection

This report details investigations that were conducted to verify the new Austroads sprayed seal design guidelines.

To verify the appropriateness of the proposed basic voids factor (Vf), and the initial sealing design approach (and also to validate…

Development of a Sprayed Seal Binder Cracking Test

This report describes research into development of a laboratory sprayed seal binder cracking test which can be used to measure the relative fatigue cracking resistance of thin binder films which have thicknesses comparable to the thicknesses of the…

Improved Laboratory Characterisation of the Deformation Properties of Granular Materials

This report examines the capacity of the extra-large wheel-tracking laboratory test method to predict the in-service performance of granular materials.

Rutting is a common distress mode of unbound granular bases under thin bituminous surfacings.

Five…

High Modulus High Fatigue Resistance Asphalt (EME2) Technology Transfer: Final Report

EME2 mixes are produced using a hard paving grade bitumen applied at a high binder content (approximately 6%). Compared to conventional asphalt bases with unmodified binders, EME2 asphalt is characterised by high stiffness, high durability, superior…

Austroads LTPP/LTPPM Study - Summary Report 2015-16

This report provides a summary of activities completed during 2015–16 for the Austroads long term pavement performance monitoring project.

Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…

Rectification of Captain Cook Bridge Bearings
Captain Cook Bridge is an iconic bridge crossing the Brisbane River, and is the most trafficked bridge in Queensland, connecting the City’s south with the Brisbane Central Business District (CBD).
Thermal Movements of Tasman Bridge
Tasman Bridge crosses the Derwent River joining Hobart to its eastern suburbs. It was built in the early 1960’s and reflects design concepts of the time. It is articulated so that the main viaducts are restrained by the abutments, with very slender…
The New AS 5100.8
  • ABC2017-073-17
  • 21 Apr 2017
  • Bridges
The new AS 5100.8 Rehabilitation and Strengthening sets out minimum requirements for the repair, extension of service life, strengthening, change of function (such as a road bridge to a pedestrian/cyclist bridge) and widening to existing bridge…
Trough-to-Deck Weld in Steel Orthotropic Deck of West Gate Bridge
As with other similar bridges throughout the world, the steel box girder spans of Melbourne’s West Gate Bridge have, in recent years, exhibited an increasing incidence of fatigue cracking.
Ambitions, Durability Risks and Asset Protection: Literature Review and Learning from Relevant Cases of Existing Bridge Structures
All reinforced concrete structures deteriorate over time. Corrosion of reinforcement is a major challenge to the durability of concrete structures. Corrosion in certain environments, such as marine, can compromise the durability of concrete and…