Publications

Filter
Topic
Publication State
Showing 1 - 10 of 168 Publications
Webinar: 2023 National Walking and Cycling Participation Survey
The National Walking and Cycling Participation Survey is a survey of the Australian community to understand their participation in walking 
Webinar: Using the Updated Guide to Road Design Parts 4 and 4A
This webinar, the second in a four-part series, provides an overview of a project, to update the Guide to Road Design (AGRD) Part 4 series. This session explains how to implement the changes in the AGRD parts 4 and 4A, including pedestrian and…
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: Zebras and Wombats: Factchecking 'False Sense of Security'
Decisions on how transport agencies provide for people walking to safely cross the roads has been greatly influenced by historical research, that has in the past failed to examine the infrastructure design and lacked behavioural data. This webinar,…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Australasian Pedestrian Facility Selection Tool [V2.2.2]: User Guide
This user guide describes the operation and outputs of the Australasian Pedestrian Crossing Facility Selection Web Tool This guide describes the user interface of the tool, including: how to access the tool the types of facilities that can and…
Selection of the most suitable electrochemical repair technique for rehabilitation of concrete bridges and structures
Transport for NSW (TfNSW) utilises various electrochemical protection systems such as cathodic protection, chloride extraction and re-alkalisation. Whilst the technical merits for re-alkalisation and chloride extraction are proven, there have been…
Birkenhead Bridge Bascule Span Deck Replacement
Opened in 1940, the Birkenhead Bridge over the Port River has a double leaf bascule opening central span. The bridge provides a critical road connection between Port Adelaide and Birkenhead while allowing shipping to access the inner harbor and its…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…