Publications

Filter
Topic
Publication State
Showing 1 - 10 of 160 Publications
Linked Work Tips Index
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Guide to Pavement Technology Part 2: Pavement Structural Design
Guide to Pavement Technology Part 2: Pavement Structural Design provides advice for the structural design of sealed road pavements. The advice has been generally developed from the approaches followed by the Austroads member agencies. However, as it…
Webinar: Update to the Guide to Bridge Technology Part 7
This webinar focuses on the recent update of Section 3 of the Austroads Guide to Bridge Technology Part 7.
Guide to Bridge Technology Part 7: Maintenance and Management of Existing Bridges
Guide to Bridge Technology Part 7 discusses the structural management of existing bridges in practical technical terms. It documents practices relevant to forward works programming, inspection, recording, reporting, evaluation of bridge condition…
Webinar: Austroads Project Pipeline 2023-24
This webinar is beneficial to consultants who may be interested in tendering for Austroads projects. The session covers new Austroads projects lined up for the 2023-24 financial year, Austroads process around research data collection and what is…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Standardised Signage and Pavement Symbols for Low and Zero Emission Vehicles
This report, published in January 2022, provides a basis for future testing and standardisation of the symbols and road signage for low and zero emission vehicles in Australia and New Zealand, paving the way to adopt consistent symbols in the road…
Maintenance challenges with the heritage listed Old Murray Bridge
Old Murray Bridge is located east of the township of Murray Bridge and spans the River Murray and the river flats on the eastern side of the river. It was opened in 1879 and was the first permanent bridge crossing over the River Murray in South…
Long-term effects of AAR in a 70-year-old concrete structure
A concrete dam structure constructed around 70 years ago, was originally identified to be affected by Alkali-Aggregate Reaction (AAR) in 2002, and at the time some chemical, mechanical and microstructural properties of concrete in various parts of…
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…