Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
58
Research Reports
1
Topic
Topic
Annual reports
61
Asphalt
67
Bicycles
69
Binders
63
Binders test methods
60
Bitumen
67
Bridge assessment
82
Bridge barriers
62
Bridge components
78
Bridge construction
116
Bridge design
174
Bridge maintenance
86
Bridge management
Bridge materials
93
Bridge performance
70
Capability assessment
60
Climate change
60
Concrete
83
Congestion
60
Cooperative ITS
63
Crash analysis
63
Data management
66
Digital engineering (BIM)
60
Driver licensing
60
Economic evaluation
68
Equipment test methods
62
Evaluation values
61
Fibre reinforced polymer
61
Financing
61
Freight policy
61
Geotextiles
60
Granular materials
61
Heavy vehicle access
67
Heavy vehicle safety
63
Indigenous communities
61
Intelligent transport systems
63
Intersection design
62
Land use
60
Logistics
60
Materials testing
81
Motorcycles
60
Network management
63
Network performance
59
Pavement construction
61
Pavement design
82
Pavement management
76
Pavement performance
89
Pedestrians
67
Performance based standards
61
Prequalification
60
Process and documentation
62
Procurement
63
Project governance
63
Project planning
61
Public transport
61
Rail bridges
73
Recycled material
59
Risk assessment
60
Road pricing
61
Roadside design
62
Rural and remote
62
Safe people
62
Safe roads
65
Safe System
63
Safe vehicles
60
Safety audit
61
Safety strategy
61
Seals
69
Smart motorways
61
Speed management
63
Steel
66
Strategic asset management
62
Structures management
63
Timber
61
Traffic controls
60
Traffic management
60
Traffic operations
60
Transport planning
60
Waterway design
59
Year
Year
2024
61
2023
60
2022
83
2021
61
2018
60
2017
80
2015
60
2014
2012
60
2011
2004
61
2002
61
1998
60
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 59 Publications
Bridge management
Remove Bridge management filter
2014
Remove 2014 filter
2011
Remove 2011 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Sustainable Management of Installation of Impressed Current Cathodic Protection Systems for Bridges of the Future
ABC-LCM104-14
22 Oct 2014
Bridges
More
The role of effective project/contract management in the successful delivery of Impressed Current Cathodic Protection (ICCP) systems has been recognised by RMS specification for ICCP, BS361, which has comprehensive provisions for the supervision of…
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
ABC-DES203-14
22 Oct 2014
Bridges
More
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Flood Resilient Bridge Design, Case Studies from Challenging Design Environments
ABC-LCM103-14
22 Oct 2014
Bridges
More
Case studies of bridges located in the Lockyer Valley in Queensland and the Solomon Islands are presented in the paper. Historically these locations have experienced extreme flooding. Flood damage at bridges can isolate communities and result in…
Strategic Review of Flood Impact on Victorian Structures
ABC-LCM303-14
22 Oct 2014
Bridges
More
Victoria has experienced a number of large-scale and intense flood events in the last four years. An assessment has been undertaken of the structures impacted by these flood events.The objective was to better understand the impact of the floods on…
Life-cycle Management of Bridges: What is the Best Approach?
ABC-LCM201-14
22 Oct 2014
Bridges
More
A key element of optimised asset management involves determining the type and timing of maintenance and renewals actions to achieve the least whole-of-life cost. This can often be a very complex process in reality because of the many different…
Building Bridges: Building Communities
ABC-LCM301-14
22 Oct 2014
Bridges
More
The paper focuses on the urban design aspects of bridge infrastructure, recognising the importance bridges have in our communities and the often overlooked social responsibility bridge builders have when undertaking such projects.Using examples from…
Auckland Harbour Bridge Painting: Development of a Future Maintenance Strategy
ABC-LCM101-14
22 Oct 2014
Bridges
More
The Auckland Harbour Bridge (AHB), built in 1959 and widened in 1969, has some 125,000 m2 of external steel surfaces which have been maintained using a patch and recoat philosophy. This has been carried out since 1998 by Total Bridge Services…
West Gate Bridge: Management of Fatigue Cracking
ABC-CAS104-14
22 Oct 2014
Bridges
More
Melbournes 2.5 km long West Gate Bridge includes an 848 m long steel box girder portion, over the Yarra River, comprising cable-stayed spans and an orthotropic steel deck. As with other similar bridges throughout the world, the steel spans of the…
What next for bridges?
ABC-IAR102-14
22 Oct 2014
Bridges
More
Bridge design is an ancient art. The principles for overcoming gravity, supporting people and vehicles and the best use of the materials at hand have evolved but are rooted in antiquity. In contrast with this stability we are perhaps going through…
An Agent-Based Framework for Improved Strategic Bridge Asset management
ABC-LCM204-14
22 Oct 2014
Bridges
More
This paper discusses an agent-based framework for improved bridge asset management. The framework comprises a geospatial representation of a network, a bridge performance deterioration model, and behavioural models of key stakeholders.Effective…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No