Publications

Filter
Topic
Publication State
Showing 1 - 10 of 100 Publications
Austroads Test Methods and Specifications
This document provides a hyperlinked list of the Austroads Test Methods and Specifications.
Modified Surface Texture Depth (Pestle Method)
This method describes the procedure for the determination of the surface texture depth of road surfaces, by the sand patch technique. This method is only applicable to surface texture depths greater than 0.3 mm. This method was developed from BS…
Deformation Resistance of Asphalt Mixtures by the Wheel Tracking Test
This document describes the procedures to be followed to test an asphalt specimen using a wheel tracking test device. The procedures can be carried out on prismatic specimens that have been manufactured in the laboratory, cut from an existing…
Verification Procedures for a Wheel Tracking Test Device
This document describes the procedures to verify that a wheel tracking test device complies with the requirements of those devices permitted for use in Austroads test method ATM 231. The procedures are advisory rather than mandatory and reference…
Characterisation of Flexural Stiffness and Fatigue Performance of Bituminous Mixes
The test method specifies procedures for the characterisation of the stiffness and fatigue behaviour of bituminous mixtures using a four point bending test configuration. The test procedure to characterise the complex modulus is contained in Section…
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &
Managing the suspension bridge in Kangaroo Valley (Hampden Bridge)
The aim of this paper is to share the experience in managing the risks facing a 125 years old Hampden Bridge which is a unique road suspension bridge in Kangaroo Valley, New South Wales. It was built in 1897 and this is a load-deficient bridge which…