Publications

Showing 1 - 10 of 73 Publications
The Challenges Faced in Assessing the Durability Risks of Reinforced Concrete Bridges in Aggressive Environments
Durability assessment is increasingly becoming an integral part of infrastructure design projects in Australia. One of the key drivers for this is the requirement by asset owners for optimum whole of life cost, minimum construction period and…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
The Torsional Strengthening of Concrete Girders Using the NSM FRP Technique with Different Configurations
The near-surface mounted (NSM) FRP technique has received attention worldwide over the externally bonded FRP strengthening technique. Strengthening of a concrete girders using fiber reinforced polymer (FRP) composites to flexural and shear…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
Bridge Design Challenges on the Waikato Expressway Huntly Section, New Zealand
The Huntly Section is a new NZ$415M section of the Waikato Expressway running between Hamilton and Auckland. It will connect the recently completed Ngaruawahia and Ohinewai sections on a route that traverses the Taupiri Ranges within a deep cutting…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
Strength Enhancement of Fire-damaged RC Circular Bridge Columns using CFRP Fabrics
In recent years the circumferential wrapping with externally-bonded carbon fibre-reinforced polymer (CFRP) composites has proven to be a promising method for strengthening concrete structures. This is particularly valuable when repairing concrete…
Shear in Prestressed Concrete I-girder Bridges
Prestressed concrete I girder bridges constructed in the 1960s and 70s have the potential to restrict transport productivity because their AS 5100.7 assessments can be poor despite satisfactory inservice performance. The primary issue is the shear…