Optimising Project Delivery Performance (Accelerated Projects)
This report provides practical advice and examples of ways to successfully accelerate transport infrastructure projects and programs up to $500 million. An accelerated project or program has delivery expedited, typically in response to external…
Code of Practice for the Management of Alkali Aggregate Reactivity Template
The Code of Practice for the Management of Alkali Aggregate Reactivity template has been developed for the use of Austroads member agencies. The document outlines the management strategies, testing and approval process required to regulate alkali…
Webinar: Multimodal Incident Management
Road agencies increasingly recognise the value of coordination and cooperation with public transport operators in responding to road and transport incidents, as it helps support a more holistic and integrated multimodal approach to minimising…
Multimodal Incident Management: Research, Principles and Capability Framework
This report details research into the ways transport agencies manage unplanned incidents that impact the normal operation of more than one transport mode. It includes 10 guiding principles and a capability framework. Road agencies need guidance on…
Improved Traffic Management Guidance: Freeway Capacity Analysis
This report documents the extensive reviews and evaluations of established and emerging methodologies in Freeway Capacity Analysis. It also documents the extensive consultations with Australian and New Zealand practitioners to capture their current…
Supply and Placement of Steel for the Reinforcement of Concrete
Austroads Technical Specification ATS 5310 sets out the requirements for the supply, fabrication, handling and placement of steel used for the reinforcement of concrete (&lsquo
Supply of Bolts, Nuts and Washers
Austroads Technical Specification ATS 5420 sets out the requirements for the supply of bolts, nuts, screws, washers, studbolts and threaded rods for steelwork. It also includes requirements for the supply of stainless steel fasteners. This…
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.