Publications

Filter
Topic
Publication State
Showing 1 - 10 of 56 Publications
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Supply and Placement of Steel for the Reinforcement of Concrete
Austroads Technical Specification ATS 5310 sets out the requirements for the supply, fabrication, handling and placement of steel used for the reinforcement of concrete (&lsquo
Supply of Bolts, Nuts and Washers
Austroads Technical Specification ATS 5420 sets out the requirements for the supply of bolts, nuts, screws, washers, studbolts and threaded rods for steelwork. It also includes requirements for the supply of stainless steel fasteners. This…
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
Webinar: Guide to Project Delivery Part 5: Road Construction Quality Assurance
This webinar, presented on 20 September 2018, provides an overview of the first edition of Austroads Guide to Project Delivery Part 5: Road Construction Quality Assurance.
Webinar: Minimum Levels of Componentisation for Road Infrastructure Assets
This webinar, presented on 11 September 2018, provides an overview of Austroads’ Guideline for Minimum Levels of Componentisation for Road Infrastructure Assets, and how to apply it.
Minimum Levels of Componentisation for Road Infrastructure Assets: Guideline
The purpose of this guideline is to assist organisations determine the appropriate minimum level of componentisation for road infrastructure assets. This guideline is designed to facilitate improved integration and alignment of asset management,…
Minimum Levels of Componentisation for Road Infrastructure Assets: Background Research
This report details the background research that underpins the Minimum Levels of Componentisation for Road Infrastructure Assets: Guideline.It provides background information to support organisations with implementation of the Guideline and includes…
Guide to Project Delivery Part 5: Road Construction Quality Assurance
Many of the shortcomings experienced in quality assured contracts reflect the way in which road agency requirements have been specified and administered. Emphasis has been placed on third party accredited quality systems, and not on the fundamentals…