Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Connected and Automated Vehicles
Corporate
Economics and Financing
Freight
Low and Zero Emission Vehicles
Materials
Pavement
Project Delivery
Registration and Licensing
Road Safety
Test Methods and Specifications
Traffic Management
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
4
Corporate Reports
2
Guides
5
Research Reports
27
Specifications
1
Technical Reports
44
Test Methods
5
Webinars
15
Work Tips
28
Topic
Topic
Active travel
163
Aggregates
141
Annual reports
146
Asphalt
235
Automated vehicle policy
146
Automated vehicle safety
148
Bicycles
187
Binders
173
Binders test methods
155
Bitumen
188
Bituminous mixes test methods
157
Bridge assessment
223
Bridge components
190
Bridge construction
286
Bridge design
403
Bridge maintenance
241
Bridge management
247
Bridge materials
247
Bridge performance
199
Bridgeworks specifications
179
Capability assessment
144
Cemented materials
145
Climate change
144
Community attitudes
144
Concrete
213
Congestion
147
Contracts
140
Cooperative ITS
Crash analysis
186
Data management
203
Design principles and process
157
Digital infrastructure
139
Drainage
146
Driver licensing
169
Drugs and alcohol
145
Economic evaluation
186
Electric vehicles
141
Equipment test methods
157
Financing
149
Freight modelling
146
Freight policy
163
Geometric design
163
Granular materials
152
Guide review
170
Heavy vehicle access
204
Heavy vehicle safety
178
Heavy vehicle weighing
148
Incident management
149
Intelligent transport systems
160
Intersection design
160
Land use
142
Level of service
154
Materials testing
243
Motorcycles
142
Network management
179
Network operations
160
Network performance
151
Older drivers
143
Other assets management
151
Pavement construction
154
Pavement design
258
Pavement investigation test methods
153
Pavement maintenance
172
Pavement management
226
Pavement performance
324
Pavements specifications
155
Pedestrians
188
Performance based standards
147
Process and documentation
144
Procurement
141
Project governance
Project planning
146
Public transport
155
Rail bridges
163
Recycled material
164
Road pricing
141
Roadside design
153
Rural and remote
162
Safe people
194
Safe roads
241
Safe System
184
Safe vehicles
172
Safety audit
146
Safety strategy
158
Seals
Speed management
180
Steel
159
Strategic asset management
180
Structures management
165
Temporary traffic management
155
Traffic and safety
147
Traffic controls
173
Traffic management
186
Traffic modelling
153
Traffic operations
154
Traffic theories and studies
145
Transport planning
155
Tunnel design
152
Tunnel operations
147
Tunnel safety
153
Year
Year
2024
2
2023
6
2022
8
2021
10
2020
7
2019
13
2018
8
2017
6
2016
3
2015
6
2014
12
2013
9
2012
5
2011
7
2010
4
2009
1
2008
5
2006
5
2005
4
2004
3
2002
1
2001
2
2000
3
1998
1
Publication State
Publication State
Archived
6
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 131 Publications
Cooperative ITS
Remove Cooperative ITS filter
Project governance
Remove Project governance filter
Seals
Remove Seals filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Webinar: Optimising Project Delivery Performance – Accelerated Projects
WEB-R706-23
27 Feb 2024
Project Delivery
More
Over the last decade there has been a trend by a number of governments to invest more heavily in transport infrastructure and systems, and to accelerate programs of work. This has been a response to various ‘burning platforms’ including transport…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Cone Penetration of Hot Poured Joint Sealant
ATM-284-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the cone penetration of a joint sealant at 25 
Flow Properties of Hot Poured Joint Sealant
ATM-281-22
4 Aug 2022
Test Methods and Specifications
More
This test method describes the procedure for determining the resistance of hot poured joint sealants to flow at a temperature of 70 °
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No