Publications

Showing 1 - 4 of 4 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Australian National Risk Assessment Model
The Australian National Risk Assessment Model (ANRAM) helps road agencies identify fatal and serious injury (severe) crash risk across all parts of the road network. ANRAM helps road agencies manage this risk through development of treatment…
Investigation of Key Crash Types: Run-off-road and Head-on Crashes in Urban Areas: Final Report
This report collates research into factors contributing to the incidence and severity of run-off-road and head-on collisions on urban roads in Australia and New Zealand. It also identifies possible measures to reduce the incidence and severity of…