Publications

Filter
Topic
Publication State
Showing 1 - 10 of 84 Publications
Hydrology Update to the Austroads Guide to Road Design Part 5
This report documents the changes to Section 6 &ndash
Webinar: 2022 Winners of the Austroads Bridge Awards
The webinar showcases the projects recognised with the Austroads Bridge Awards. The Austroads Bridge Awards acknowledge individuals and organisations that have delivered outstanding bridge structures and design across Australia and New Zealand. The…
Webinar: Changes to Guide to Road Design Part 5 – Improvements to the Regional Flood Frequency Estimation Method
This is the second webinar in a two-webinar series, and it covers the improvements made to the Regional Flood Frequency Estimation (RFFE) method in the Guide to Road Design Part 5.
Webinar: Changes to the Guide to Road Design Part 5: Drainage – General and Hydrology Considerations
In response to feedback provided by industry and stakeholders, Austroads has reviewed its Guide to Road Design Part 5: Drainage &ndash
Guide to Road Design Part 5: Drainage-General and Hydrology Considerations
The Guide to Road Design Part 5: Drainage – General and Hydrology Considerations provides road designers and other practitioners with guidance on the design of drainage systems.
Guide to Road Design Part 5A: Drainage: Road Surface, Networks, Basins and Subsurface
The Guide to Road Design Part 5A: Drainage: Road Surface, Networks, Basins and Subsurface, provides road designers and other practitioners with guidance on the design of the collection and discharge of water from road surfaces, pit and pipe systems,…
Guide to Road Design Part 5B: Drainage-Open Channels, Culverts and Floodway Crossings
Guide to Road Design Part 5B: Drainage &ndash
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Sydney Harbour Bridge Rail Deck Upgrade
The Sydney Harbour Bridge was completed in 1932 and at that time carried six road lanes and two rail corridors on each side. The rail corridor on the eastern side was used for trams and was replaced by a roadway in the late 1950ís. The rail corridor…
Sydney Gateway Project - Bridges
  • ABC2022-128-22
  • 18 Nov 2022
  • Bridges
Sydney Gateway is a road and rail project to cater for forecast growth in passengers and freight through Sydney Airport and Port Botany. The project comprises road (Stages 1 &