Publications

Showing 1 - 4 of 4 Publications
Incorporating ACI 440.8 into AS 5100.5 for FRP Strengthening Via M80 Upgrade Project Case Study
As bridges age and standards evolve, it has become increasingly necessary to strengthen existing bridges as a much cheaper option than replacing bridges as a whole.
Rural Bridge Cost Benefit Analysis and Inclusion Within an Investment Program
Economic analysis can inform investment decisions around proposed bridge projects. This paper outlines the evaluative techniques and methodologies used in appraising a proposed bridge replacement and approach realignment project located in rural…
Namoi Floodplain Viaduct: Design of a 1 Km Rail Viaduct in a Remote Area for a 35-Year Design Life
The Boggabri Maules Creek Rail project will connect the existing Werris Creek to Mugindi railway line to the existing Boggabri Coal Mine and the new Maules Creek Coal Mine.The railway line will provide Boggabri Coal Mine with improved logistics,…
Methods for Reducing Speeds on Rural Roads: Compendium of Good Practice
This compendium presents information on speed as a contributor to rural road crashes. It provides information on treatments that can be used to address speed, either at key locations (curves, intersections or the approach to towns) or for routes in…