Publications

Filter
Publication State
Showing 1 - 6 of 6 Publications
Webinar: Development of National Mass Assessment Procedures for Oversize Overmass Vehicles
This webinar, presented on 12 December 2017, provides an overview of the key findings of an Austroads project on the weighing of oversized and overmass vehicle combinations using portable scales. It outlines the vehicles and weighing methods that…
Development of National Mass Assessment Procedures for Oversize Overmass Vehicles
This report describes the conduct of field trials involving repeated weighing of four different Oversize Overmass (OSOM) vehicle combinations using portable scales.
Traffic Data Collection Using a Bridge-Weigh-in-Motion System in a Cable- Stayed Bridge
Reliable live traffic data collection is crucial for effective pavement life prediction, fatigue estimation, vibration control, maintenance, and condition assessment of the bridge structures. Bridge weigh-in-motion (BWIM) is a technology utilising a…
How is your Bridge Behaving? Advanced Monitoring of New Zealand’s Longest Bridges
At 1.76km long, the Rakaia River Bridge is the longest bridge in New Zealand. When combined with the Rangitata River Bridges (identical structural form), these structures comprise 223 spans and over 2.7km of reinforced concrete bridge on State…
3D BIM Modelling Challenges for the Bridge over Uarbry Causeway
Roads and Maritime Services (Roads and Maritime) has engaged Opus International Consultants (Opus) to undertake the detailed design and preparation of tender documentation for the bridge over Uarbry Causeway on the Golden Highway (HW27), 64.4km west…
Digital Engineering for Bridge Infrastructure Projects
Digital Engineering (DE) / Building Information Modelling (BIM) has been identified as an important emerging technology, with the potential to streamline processes throughout the design, construction, and operation and maintenance life cycle. The…