Publications

Filter
Publication State
Showing 1 - 10 of 18 Publications
Webinar: Road Transport Management Framework and Principles
This webinar, presented on 26 October 2017, provides an overview of current and contemporary road transport management practices in Australasia and a harmonised framework. The webinar was presented by Dr Aut Karndacharuk and Asif Hassan. The…
Road Transport Management Framework and Principles
This report reviews international and local road transport management (RTM) practice to inform the development of a harmonised RTM framework.
Webinar: Guide to Traffic Management Part 5: Road Management (2017 Edition)
This webinar, presented on 12 September 2017, provides an overview of the key changes to the Guide to Traffic Management Part 5, such as the incorporation of concepts such as Movement and Place, Network Operation Planning, road allocation and the…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
Epping To Thornleigh Third Tracking (Ettt) Project - M2 Bridge Alternative Design, Sydney
The existing rail lines at this location sit on a marginally stable embankment of 1.5:1 slope and height varying between 6m to 15m. The existing lines cross the M2 motorway via an under-bridge and Devlin’s creek via an old masonry arch culvert.
KiwiRail Long-term Rail Bridge Renewal Management
KiwiRail manages a wide range of rail assets, including approximately 1700 bridges and major culverts within resource and investment constraints. With an existing asset stock that is aging there is increased pressure to manage assets on whole-of-…