Publications

Showing 1 - 6 of 6 Publications
Development of the Accessibility-Based Network Operations Planning Framework
This report extends the Austroads network operation planning framework to address transport accessibility issues.
Signal Management Techniques to Support Network Operations
This project has developed guidance on how signal management and operation should be undertaken to realise the intent of network operation planning and achieve the desired performance outcomes for road users.
Seal Design Improvement for Low Volume Roads

The current version of the Austroads sprayed seal design method was published in 2006 and has been in use for the last nine years. During recent times, a number of sprayed sealing practitioners have indicated that the basic voids factor for single/…

Towards Incorporating Heavy Vehicles into Sprayed Seal Design: Stage 2

Traffic loadings on Australia’s extensive sprayed seal network have increased, particularly with freight efficiency resulting in longer and heavier loads being transported by prime movers.

This report details the development of a model to describe…

Sprayed Sealing - Initial Treatment of Stabilised Pavements
This Pavement Work Tip provides a guide to the use of priming and primersealing as initial treatments on stabilised pavements.
Development of Product Acceptance Techniques for Road Network Devices
This report documents a harmonised Austroads product acceptance process for ITS products in the road network. The process covers six steps including determination of performance requirements based on agreed key performance indicators (KPIs),…