Publications

Filter
Topic
Publication State
Showing 1 - 10 of 14 Publications
Sprayed Sealing – Calibration of Bitumen Sprayers
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Webinar: Asphalt Laboratory Fatigue Relationships
The Austroads mechanistic-empirical design system documented in Part 2 of the Guide to Pavement Technology uses a laboratory fatigue relationship previously developed by Shell to predict the fatigue life of asphalt layers. The Shell fatigue…
Asphalt Laboratory Fatigue Relationship: Stage 1 Utilisation of Existing Data
This report documents the findings of the first stage of an Austroads project which aims to benchmark the laboratory fatigue performance of locally manufactured asphalt mixes against the performance predicted by the Shell relationship in Austroads…
Design and Performance of Foamed Bitumen Stabilised Pavements: Progress Report 3

There is a need to improve the Austroads procedures for mix design and structural design of foamed bitumen stabilised materials. This progress report summarises the mix design test methods drafted to date and those planned for 2015–16 within the…

Seal Design Improvement for Low Volume Roads

The current version of the Austroads sprayed seal design method was published in 2006 and has been in use for the last nine years. During recent times, a number of sprayed sealing practitioners have indicated that the basic voids factor for single/…