This report describes a two-year study designed to quantify the immediate and longer-term maintenance impact of grader blading and surface re-sheeting on unsealed roads.
The project assembled and analysed roughness data collected by Cassowary Coast…
This report provides a summary of activities completed during 2014–15 for the Austroads long term pavement performance monitoring project.
Austroads has funded the long-term pavement performance study since late 1994. The project monitors the…
This proof of concept study used the data condensation technology of stochastic information packets (SIPs) in MS Excel to allow complete storage of all collected data. This approach, when connected to a pavement management system (PMS), was able to…
This study obtained an indication of the proportion of Australian commercially manufactured polymer modified binders (PMBs) liable to segregate, identifed suitable tests to measure segregation propensity and proposes measures to help prevent or…
This report is an investigation on the development of the performance relationships used in the 2002 AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG). The primary objective of this investigation was to see if these relationships could be…
This report is a scoping document aimed at establishing how road deterioration (RD) models can be developed on a probabilistic basis. Deterministic RD models provide an average estimate to a future condition which is not necessarily likely to be…
Austroads Project AT1064 Long Term Performance Monitoring to Develop Consistent Performance Models has been running since 1994-95. A review of the analysis of US long term pavement performance (US LTPP) data used to validate the performance…