Publications

Filter
Publication State
Showing 1 - 10 of 27 Publications
Webinar: Introducing the Updated Pedestrian Facility Selection Tool (2017)
This webinar provides an introduction to the Austroads Pedestrian Facility Selection Tool and demonstrate how to use it with a fully worked example. The tool is designed to help Australian and New Zealand practitioners select the most appropriate…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Shared Path Bridges over Warringah Road Frenchs Forest, Sydney, Australia
As part of the Northern Beaches Hospital Connectivity and Network Enhancement Project, Warringah Road is being upgraded and widened to accommodate grade separation. The upgrade includes two new shared path bridges, at Forest Way and Hilmer Street,…
Epping To Thornleigh Third Tracking (Ettt) Project - M2 Bridge Alternative Design, Sydney
The existing rail lines at this location sit on a marginally stable embankment of 1.5:1 slope and height varying between 6m to 15m. The existing lines cross the M2 motorway via an under-bridge and Devlin’s creek via an old masonry arch culvert.
Hendon Park Footbridge and the Waterview Shared Path Bridges Connecting Communities
The Waterview Connection completes Auckland’s Western Ring Route and is NZ Transport Agency’s largest ever motorway project which also includes a raft of community facilities to re-invigorate the area including a new cycleway network. The shared…
Design of the New Shared Use Path Bridge over the Maribyrnong River Using Weathering Steel
To improve the amenity for cyclists and pedestrians travelling on Melbourne’s second busiest cycle path, a new Shared Use Path (SUP) Bridge has been designed to provide a new and improved crossing of the Maribyrnong River. This new 190 m long and 4.…