Publications

Filter
Topic
Publication State
Showing 1 - 10 of 44 Publications
Webinar: Guide to Project Delivery Parts 2 and 3 Update
Two parts of the Austroads Guide to Project Delivery &ndash
Guide to Project Delivery Part 3: Contract Management
The Guide to Project Delivery consists of five parts. Part 3 is concerned with the procurement and management of road construction contracts. It covers in detail, key processes and procedures relating to documentation and contract administration. It…
Webinar: Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
This webinar, presented by Adrian Bridge on 31 July 2020, provides an overview of a new procurement decision tool and its application to a road infrastructure project, the Toowoomba Second Range Crossing (TSRC) in Queensland. The procurement…
Procurement Decision Tool: A Case Study of the Toowoomba Second Range Crossing
The procurement decision tool (&ldquo
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.
Webinar: General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
This webinar, presented on 25 July 2019, provides an overview of the new General Conditions of Contract for Construction - National Capital Works 4 (NCW4), released by Austroads and the Australian Procurement and Construction Council (APCC).
2017 Revision of Australian Standard AS 5100 Part 2: Design Loads
Part 2 Design loads of Australian Standard AS 5100 Bridge design sets out the parameters for loads on all bridges in Australia. There have been numerous enhancements to improve the scope, clarity and intent. Design loads for road traffic barriers…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…