Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Corporate
Environment
Freight
Materials
Pavement
Project Delivery
Test Methods and Specifications
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
25
Corporate Reports
1
Guides
6
Research Reports
12
Specifications
6
Technical Reports
48
Test Methods
5
Webinars
18
Work Tips
28
Topic
Topic
Active travel
181
Aggregates
155
Annual reports
164
Asphalt
235
Automated vehicle policy
167
Automated vehicle safety
176
Bicycles
205
Binders
183
Binders test methods
173
Bitumen
199
Bituminous mixes test methods
175
Bridge assessment
239
Bridge components
206
Bridge construction
302
Bridge design
417
Bridge maintenance
255
Bridge management
264
Bridge materials
248
Bridge performance
217
Bridgeworks specifications
194
Capability assessment
162
Cemented materials
160
Climate change
161
Community attitudes
162
Concrete
219
Congestion
165
Contracts
159
Cooperative ITS
180
Crash analysis
205
Data management
222
Design principles and process
176
Digital infrastructure
159
Drainage
161
Driver licensing
188
Drugs and alcohol
163
Economic evaluation
205
Electric vehicles
163
Equipment test methods
175
Financing
167
Freight modelling
164
Freight policy
181
Geometric design
181
Granular materials
170
Guide review
187
Heavy vehicle access
222
Heavy vehicle safety
196
Heavy vehicle weighing
166
Incident management
167
Intelligent transport systems
178
Intersection design
178
Land use
160
Level of service
172
Materials testing
255
Motorcycles
160
Network management
197
Network operations
178
Network performance
169
Older drivers
161
Other assets management
168
Pavement construction
170
Pavement design
268
Pavement investigation test methods
171
Pavement maintenance
190
Pavement management
243
Pavement performance
332
Pavements specifications
168
Pedestrians
206
Performance based standards
165
Process and documentation
162
Procurement
161
Project governance
161
Project planning
170
Public transport
174
Rail bridges
181
Recycled material
Road pricing
159
Roadside design
171
Rural and remote
179
Safe people
212
Safe roads
260
Safe System
202
Safe vehicles
194
Safety audit
164
Safety strategy
176
Seals
Speed management
198
Steel
Strategic asset management
198
Structures management
182
Temporary traffic management
173
Traffic and safety
165
Traffic controls
191
Traffic management
204
Traffic modelling
171
Traffic operations
172
Traffic theories and studies
163
Transport planning
173
Tunnel design
170
Tunnel operations
165
Tunnel safety
171
Year
Year
2024
1
2023
11
2022
20
2021
16
2020
6
2019
9
2018
3
2017
18
2016
4
2015
3
2014
12
2013
6
2012
3
2011
7
2010
4
2009
1
2008
5
2006
5
2005
4
2004
3
2002
1
2001
2
2000
5
Publication State
Publication State
Archived
7
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 1 - 10 of 149 Publications
Recycled material
Remove Recycled material filter
Seals
Remove Seals filter
Steel
Remove Steel filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Linked Work Tips Index
AP-PWT00-24
13 May 2024
Pavement
More
This linked index of the Pavement Work Tips is designed to help practitioners easily access the more than 50 publications in the Work Tips collection.
Supply of Recycled Crushed Glass Sand
ATS-3050-23
Edition: 2.0
14 Dec 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 3050 sets out the minimum requirements for the manufacture and supply of recycled crushed glass (RCG) for use in the following applications: As a granular material, including: bedding and haunching of pipes and…
Sprayed Sealing – Calibration of Bitumen Sprayers
AP-PWT34-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides information on the essential elements of the calibration process for bitumen sprayers.
Sprayed Sealing – Selecting Aggregate Size
AP-PWT19-23
25 Aug 2023
Pavement
More
This Pavement Work Tip details the general principles affecting aggregate size selection and provides recommended aggregate sizes for a range of sealing treatments.
Sprayed Seals – Pre-spraying to Correct Surface Texture
AP-PWT36-23
25 Aug 2023
Pavement
More
This Pavement Work Tip outlines the procedure to allow for surface texture variations by pre-spraying of additional binder.
Sprayed Sealing – Minimising Handwork
AP-PWT22-23
25 Aug 2023
Pavement
More
This Pavement Work Tip provides instructions on how to minimise sprayed sealing handwork and gives some suggestions for maximising the use of a sprayer when sealing tapers and roundabouts.
Sprayed Seals – Aggregate Spread Rates and Spreader Calibration
AP-PWT35-23
25 Aug 2023
Pavement
More
This Pavement Work Tip describes the requirements for the selection of an appropriate design aggregate spread rate and the calibration of aggregate spreading equipment for uniformity and consistency of output.
Sprayed Sealing in Extremely Hot Weather
AP-PWT52-23
25 Aug 2023
Pavement
More
This Pavement Work Tip refers to minimising the risk of bleeding when carrying out sprayed sealing work during extreme hot weather events, especially when subject to slow moving or stationary heavy traffic, or unusually heavy loads.
Austroads Members Environment and Sustainability Initiatives Stocktake 2023
AP-C114-23
15 Jun 2023
Environment
More
Austroads member agencies are actively addressing greenhouse gas emissions and other key environmental issues. This table summarises environmental and sustainability initiatives in place across Australia and New Zealand in 2023. Lighter shaded cells…
Supply of Polymer Modified Binders
ATS-3110-23
Edition: 2.0
5 Jun 2023
Test Methods and Specifications
More
Austroads Technical Specification ATS 3110 sets out the requirements for the supply of polymer modified binders (PMBs) and crumb rubber modified binders for use in both sprayed sealing and asphalt applications. The technical specification can also…
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No