Publications

Filter
Topic
Publication State
Showing 1 - 10 of 114 Publications
Austroads Extended Vehicle Classification Scheme for Traffic and Transport Surveys
Austroads extended vehicle classification scheme builds on the influential 1994 scheme. The extended scheme provides greater granularity across the 12 classes in the 1994 scheme. It also provides a new classes for: active transport to address the…
Webinar: Austroads National Harmonisation of Temporary Traffic Management Practice – Update
In this webinar, Chris Koniditsiotis, Lead Implementation Consultant and Patsy Thomas, National Temporary Traffic Management (TTM) Operations Manager provide an update on the implementation and operational commencement of the Austroads National…
Multimodal Incident Management: Reference Architecture
This report presents a set of reference architecture models, content and guidance for use by road agencies to identify, plan and improve their Multimodal Incident Management (MMIM) capabilities. MMIM is defined as the resolution of an unplanned…
Australasian Pedestrian Facility Selection Tool [V2.2.2]: User Guide
This user guide describes the operation and outputs of the Australasian Pedestrian Crossing Facility Selection Web Tool This guide describes the user interface of the tool, including: how to access the tool the types of facilities that can and…
High Workability Concrete - Verification of Properties and Performance Criteria
Transport for New South Wales (TfNSW) QA Specification B80 'Concrete work for Bridge' (TfNSW B80)10 has seen continual improvement over the years. These improvements adopted recent industry trends and new technologies including self-compacting…
Effects of increasing Limestone content of cement on concrete performance
In attempts to reduce the CO2 footprint of the construction industry, technologies have been developed in the past for the replacement of Portland cement by other materials, such as supplementary cementitious materials (SCMs), which have had the…
Bridge Strengthening Design and Construction - Dynon Road Bridge over Moonee Ponds Creek, West Melbourne
The Dynon Road Bridge over Moonee Ponds Creek is a 12-span, 61 metre long cast in-situ concrete flat-slab bridge constructed in 1941. This art-deco style bridge is heavily trafficked and an important link between Melbourneís western suburbs and the…
Concrete Technology and Durability in TMR - Past, Present and Future
This paper will give a brief history of our concrete technology and concrete durability journey within TMR QLD over the last 20 years together with our present position and issues, and where we see some of our future challenges and development.…
'Smart' bridge components (expansion joints, bearings, seismic devices) for intelligent infrastructure
The potential benefits of using structural health monitoring systems in measuring and recording bridge data have been established in many applications around the world, but the efficiency and effectiveness of such systems depends on how they are…
Seismic Resilience, Sustainability, Accelerated Bridge Construction and Urban Design for the Peka Peka to Ōtaki Expressway Bridges
The Peka Peka to Ōtaki (PP2O) Expressway is a 12km section of the new Kapiti Expressway, north of Wellington, New Zealand. The project includes nine road bridges, two underpasses, five pedestrian bridges and several large culverts. Innovative…