Publications

Filter
Topic
Publication State
Showing 31 - 40 of 61 Publications
Bridge Inspection Audit an Effective Tool for Asset management
Roads and Maritime Services, New South Wales is responsible for managing over 5600 bridges and bridge size culverts, with a written down value of 12.5 billion and a replacement cost of 18.2 billion. Roads and Maritime bridge stock is the oldest and…
Network Importance of Melbourne's Metropolitan Bridges: Development of a Strategic Bridge Prioritisation Framework
VicRoads manages a network of some 1,700 bridges across metropolitan Melbourne. Many of these bridges are critical for the safe operation of the transport network which provides for the movement of passenger and freight vehicles and public transport…
Bridge Condition Inspections Using Unmanned Aerial Vehicles: A Trial Project
VicRoads manages a significant number of structures where access for inspection is difficult due to height, length and the obstacle being crossed
Weather Resistant Steel As Viable Option For Country Timber Bridge Replacements
Steel in bridge construction in Australia has declined significantly over the last 40 years from around 25% of bridges to as low as 5% of bridges in recent years. The main reasons for this have been the proliferation of precast prestressed concrete…
Country Bridge Solutions
  • ABC2017-034-17
  • 20 Apr 2017
  • Bridges
Local councils face the growing challenge, as road authorities, of maintaining and eventually replacing ageing bridges on regional and local roads.
Rehabilitation of Corrugated Metal Pipe Culverts: Asset management
VicRoads monitors a number of structures along its road networks through the structure monitoring program. In October 2014, VicRoads identified significant corrosion on two triple-cell corrugated metal culverts under the Mornington Peninsula Freeway…
Force Ratio of Polymer Modified Binders (ARRB Extensiometer)
This test method sets out the procedures for the determination of the force ratio and toughness of bitumen and PMBs under specific conditions of deformation using the ARRB extensiometer.
Improved Bridge Deterioration Models, Predictive Tools and Costs
The management of Australia and New Zealand’s bridge stock involves the development of forward works programs for periods up to, and longer than, ten years into the future. The scheduling of maintenance, rehabilitation and replacement, forms part of…
Design of Bituminous Binder Blends to a Specified Viscosity Value
This test method provides a guideline for the design of a blend of RAP binder, virgin binder, and/or rejuvenating agent to a target viscosity.
Time-Variant Performance Indicators for Concrete Bridges Exposed to Corrosion
The life-cycle performance of concrete bridges exposed to corrosion is investigated based on a set of time-variant probabilistic performance indicators including structural reliability, redundancy, robustness and resilience. The performance…