Publications

Filter
Topic
Publication State
Showing 41 - 50 of 170 Publications
Analysis and Design of St Peters Interchange Bridges
In November 2015, the Sydney Motorway Corporation awarded the Leighton Dragados Samsung Joint Venture the contract for the design and construction of Stage 2 ñ New M5 (Now M8) of the WestConnex project. The M8 runs from the existing M5 East corridor…
Recycled Bridges: A Review of Current and Emerging Recycled Material Technology
There is a growing requirement for infrastructure to consider sustainable practices to ensure the preservation of resources and achievement of climate change ambitions. In the areas of recycled materials, the Australian Federal Government has…
Design and construction of civil structures on Mordialloc Bypass
Jacobs worked for McConnell Dowell - Decmil Joint Venture consortium and Major Road Projects Victoria to design the Mordialloc Bypass. The 9km long freeway connects the Mornington Peninsula Freeway to the Dingley Bypass, improving connectivity in…
Westconnex St Peters Interchange Integral Cut and Cover Structure Design
The Westconnex M4-M5 Link Tunnels project is the third stage of the Westconnex program of works in Sydney. The project links the southwestern M5 to Western M4, passing through St Peters Interchange, the most complex interchange in Sydney to date.…
Bridging Regional Communities - The Joy Baluch AM Brifge Duplication, Port Augusta
The paper will describe key technical elements of the Joy Baluch AM Bridge Duplication, constructed to bridge the upper Spencer Gulf in Port Augusta, SA. The 550m long bridge duplicates the 1970 structure, to provide badly needed additional traffic…
Webinar: Technical Basis of Changes to Guide to Pavement Technology
Austroads has published two technical reports drawing together the research underpinning changes made to key components of the Guide to Pavement Technology. The reports detail the technical basis for changes made to 
Webinar: Design and Construction Guidelines for the Delivery of Large Cantilever and Gantry Structures
Over recent years there have been a number of incidents of structural failures of sign and high mast lighting structures across Australia and New Zealand, primarily due to poor design and construction practices. In addition to the obvious…
Technical Basis of Austroads Guide to Pavement Technology Part 2: Pavement Structural Design
This report documents the technical basis of the 2010, 2012 and 2017 editions of Austroads&rsquo
Design and Construction Guidelines for the Delivery of Large Cantilever and Gantry Structures
This guideline documents consistent advice for the design and construction of large cantilever and gantry structures that is aligned with national and international best practice. Over recent years there have been a number of incidents of structural…
Webinar: Development of Design Procedures for Lightly Bound Cemented Materials in Flexible Pavements
The addition of a small amount of cementitious binder to non-standard granular materials may result in a fit for purpose base or subbase at a significantly lower cost than crushed rock complying with standard specifications. Such lightly bound…