Designing a Complex Elevated Interchange over the Sea Using Precast Segmental Construction Techniques
In view of the increasing demand on reducing reliance on limited labour resources, modular construction, such as the precast deck segments, precast piers and precast pile cap shells, is increasingly being adopted as an integral part of the…
The design and construction of the extension and widening of the existing Karel Avenue grade separation over railway with the new bridge no.1595A
The Karel Avenue Upgrade Project delivered by Main Roads Western Australia and constructed by Georgiou Group, aimed to improve traffic mobility and accommodate future developments in the area. Part of the project, completed in 2021, comprised the…
Analysis and Design of St Peters Interchange Bridges
In November 2015, the Sydney Motorway Corporation awarded the Leighton Dragados Samsung Joint Venture the contract for the design and construction of Stage 2 ñ New M5 (Now M8) of the WestConnex project. The M8 runs from the existing M5 East corridor…
Recycled Bridges: A Review of Current and Emerging Recycled Material Technology
There is a growing requirement for infrastructure to consider sustainable practices to ensure the preservation of resources and achievement of climate change ambitions. In the areas of recycled materials, the Australian Federal Government has…
Design and construction of civil structures on Mordialloc Bypass
Jacobs worked for McConnell Dowell - Decmil Joint Venture consortium and Major Road Projects Victoria to design the Mordialloc Bypass. The 9km long freeway connects the Mornington Peninsula Freeway to the Dingley Bypass, improving connectivity in…
Westconnex St Peters Interchange Integral Cut and Cover Structure Design
The Westconnex M4-M5 Link Tunnels project is the third stage of the Westconnex program of works in Sydney. The project links the southwestern M5 to Western M4, passing through St Peters Interchange, the most complex interchange in Sydney to date.…
Bridging Regional Communities - The Joy Baluch AM Brifge Duplication, Port Augusta
The paper will describe key technical elements of the Joy Baluch AM Bridge Duplication, constructed to bridge the upper Spencer Gulf in Port Augusta, SA. The 550m long bridge duplicates the 1970 structure, to provide badly needed additional traffic…
National Harmonisation of Temporary Traffic Management Practice: Benefit–cost Analysis
This report details an economic evaluation of Austroads&rsquo
Webinar: Austroads Innovative Temporary Traffic Management Device and Solution Assessment (AITDSA) Scheme
This webinar, presented by Austroads Temporary Traffic Management Project Manager Chris Koniditsiotis and AITDSA Workstream Manager Gavin Hill, is an overview of the Austroads Innovative Temporary Traffic Management Device and Solution Assessment…
Webinar: Road Authority Data for Connected and Automated Vehicles
The Austroads Road Authority Data for Connected and Automated Vehicles (RADCAV) project studied the provision of agency-owned data to connected and automated vehicles (CAVs) addressing six high-priority data sets: roadworks, incidents, variable…