Upgrading The Great Ocean Road Infrastructure: Strengthening Skenes Creek Bridge and Adding a New Pedestrian Path Works
This paper will present a detailed assessment undertaken of an existing three spans simply supported reinforced concrete bridge constructed in 1979, located in the Colac Otway Shire over the Great Ocean Road, Victoria. The structural assessment and…
Darlington Upgrade Project - Bridge Design for Manufacture and Assembly
The Darlington Upgrade Project consists of the upgrade of approximately 3.3 kilometres of the existing Main South Road forming part of the Adelaide North-South Transport Corridor. It has eight bridges including three long-span composite steel box…
Parametric Design and Engineering of the Bridge of Remembrance, Hobart
A new pedestrian and bicycle bridge, the Bridge of Remembrance (BoR), now links two of Hobartís most significant places of remembrance ñ the Cenotaph and Soldiers Memorial Avenue on the Queens Domain, with its trees and plaques honouring World War I…
A Rail Link to the Flinders Precinct
The Flinders Link Project incorporates the design of 650 m rail extension of the Tonsley Rail Line to the Flinders Medical Centre and University precinct south of Adelaide CBD, comprising of a 430 m long viaduct, a new station and an elevated…
Designing a Complex Elevated Interchange over the Sea Using Precast Segmental Construction Techniques
In view of the increasing demand on reducing reliance on limited labour resources, modular construction, such as the precast deck segments, precast piers and precast pile cap shells, is increasingly being adopted as an integral part of the…
The design and construction of the extension and widening of the existing Karel Avenue grade separation over railway with the new bridge no.1595A
The Karel Avenue Upgrade Project delivered by Main Roads Western Australia and constructed by Georgiou Group, aimed to improve traffic mobility and accommodate future developments in the area. Part of the project, completed in 2021, comprised the…
Analysis and Design of St Peters Interchange Bridges
In November 2015, the Sydney Motorway Corporation awarded the Leighton Dragados Samsung Joint Venture the contract for the design and construction of Stage 2 ñ New M5 (Now M8) of the WestConnex project. The M8 runs from the existing M5 East corridor…
Recycled Bridges: A Review of Current and Emerging Recycled Material Technology
There is a growing requirement for infrastructure to consider sustainable practices to ensure the preservation of resources and achievement of climate change ambitions. In the areas of recycled materials, the Australian Federal Government has…
Design and construction of civil structures on Mordialloc Bypass
Jacobs worked for McConnell Dowell - Decmil Joint Venture consortium and Major Road Projects Victoria to design the Mordialloc Bypass. The 9km long freeway connects the Mornington Peninsula Freeway to the Dingley Bypass, improving connectivity in…
Westconnex St Peters Interchange Integral Cut and Cover Structure Design
The Westconnex M4-M5 Link Tunnels project is the third stage of the Westconnex program of works in Sydney. The project links the southwestern M5 to Western M4, passing through St Peters Interchange, the most complex interchange in Sydney to date.…