Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Bridge Conference Papers
44
Topic
Topic
Active travel
47
Aggregates
47
Alcohol interlocks
45
Annual reports
45
Asphalt
57
Assessing Fitness to Drive
47
Automated vehicle policy
49
Automated vehicle safety
45
Bicycles
46
Binders
48
Binders test methods
51
Bitumen
53
Bituminous mixes test methods
52
Bridge assessment
75
Bridge barriers
45
Bridge components
59
Bridge construction
Bridge design
81
Bridge maintenance
73
Bridge management
66
Bridge materials
66
Bridge performance
61
Bridgeworks specifications
48
Capability assessment
46
Climate change
47
Concrete
50
Congestion
46
Contracts
46
Data management
51
Digital infrastructure
46
Drainage
47
Driver licensing
48
Drugs and alcohol
46
Earthworks
47
Economic evaluation
47
Electric vehicles
49
Freight modelling
46
Freight policy
46
Guide review
50
Heavy vehicle access
46
Heavy vehicle safety
46
Hydrogen vehicles
46
Incident management
46
Materials testing
53
Network management
47
Network operations
46
Older drivers
46
Pavement design
48
Pavement investigation test methods
45
Pavement maintenance
45
Pavement performance
50
Pavements specifications
47
Pedestrians
47
Prequalification
45
Procurement
46
Project governance
46
Project planning
49
Public transport
47
Recycled material
58
Roadside design
48
Rural and remote
45
Safe people
49
Safe roads
54
Safe System
47
Safe vehicles
46
Safety audit
47
Safety programs
45
Safety strategy
45
Seals
50
Smart motorways
46
Speed management
48
Stabilised materials
47
Strategic asset management
45
Structures management
45
Temporary traffic management
46
Traffic controls
49
Traffic management
47
Transport planning
45
Tunnel design
48
Tunnel operations
47
Tunnel safety
49
Year
Year
2023
45
2022
2021
46
2020
47
2018
45
2017
84
2016
45
2014
70
2012
45
2011
77
2003
45
2001
45
2000
46
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 21 - 30 of 44 Publications
Bridge construction
Remove Bridge construction filter
2022
Remove 2022 filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Echuca Moama Bridge Project - Campaspe River Road and SUP Bridge Challenges
ABC2022-050-22
17 Nov 2022
Bridges
More
The $323.7 million Echuca Moama Bridge Project involves construction of a new link road between Warren Street in Echuca and Boundary Road in Moama at Stage 3 of works. As part of the project, a new 2-lane road bridge and shared use path (SUP) bridge…
Structures on the Tonkin Gap Project in Perth
ABC2022-122-22
17 Nov 2022
Bridges
More
The $400 million Tonkin Gap and Associated Works Project is part of an infrastructure package announced in 2019, addressing a major bottleneck on Tonkin Highway between the recent Gateway WA and Northlink WA projects and preparing the existing…
The SH1-18 Underpass on Auckland's Northern Corridor Improvements Project
ABC2022-113-22
17 Nov 2022
Bridges
More
The Northern Corridor Improvements project is an accelerated highway development scheme that is being delivered under an alliance contract for Waka Kotahi NZ Transport Agency (Waka Kotahi) to improve travel time and reliability of inter-regional…
Design and Construction of the Eumemmerring Creek Bridge
ABC2022-055-22
17 Nov 2022
Bridges
More
The Eumemmerring Creek Bridge is located on the Cranbourne Line, beyond Dandenong in Melbourne's southeast. The single-track rail bridge was opened to rail traffic on Feb 2022, duplicating the existing track, and forms part of the wider Cranbourne…
Integral bridge with full height abutment requirement and design
ABC2022-074-22
17 Nov 2022
Bridges
More
Many level crossings have been removed in Victoria since 2016 to improve safety for road users and pedestrians. Typically, they are single span or two span bridges over existing rail tracks and without batter in front of abutment to allow rail…
Adopting Advanced Design Techniques in the Design of Precast Segmental Viaduct: the Singapore Experience
ABC2022-002-22
17 Nov 2022
Bridges
More
For the design of rail viaducts in our congested cities and for rail viaducts having complex geometry with grade separation, the adoption of precast segmental construction techniques is becoming the almost universal approach. The transportation and…
Bridge Design and Construction for the Bruce Highway Upgrade at Caloundra Road to Sunshine Motorway
ABC2022-017-22
17 Nov 2022
Bridges
More
The Bruce Highway Upgrade project is a $932m highway improvement scheme between Caloundra Road and Sunshine Motorway (CR2SM) on the Sunshine Coast in Queensland. The project involves the widening of the existing highway to 6 lanes over a heavily…
The Design and Construction of the Bridge over the Nepean River on Avon Dam Main Access Road
ABC2022-039-22
17 Nov 2022
Bridges
More
Inspections and load ratings commissioned by WaterNSW discovered that the Bridge over the Nepean River was in poor condition, concluding that the bridge was unusable and needed replacing. With the Avon Dam Main Access Road being a critical route for…
Design of Steel-Concrete Composite Box Girders Installed by SPMT on the Regency Road to Pym Street Project
ABC2022-044-22
17 Nov 2022
Bridges
More
The Regency Road to Pym Street (R2P) project was a $354 million upgrade of a 1.8km section of Adelaideís North-South corridor. The project was delivered by the R2P Alliance consisting of the Department for Infrastructure and Transport (DIT),…
Load Rating Factors Calculation for Bridge Deck as per AS5100.5 - A Tee-Roff Bridge Example
ABC2022-079-22
16 Nov 2022
Bridges
More
Bridge assessment is one of the vital tasks carried out by Main Roads WA for approving heavy vehicle movements over bridges on public roads. The adoption of modified compression field theory by AS 5100.5 Bridge design - Concrete code has made the…
Prev
1
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No