Publications

Filter
Topic
Publication State
Showing 21 - 30 of 368 Publications
Bridge over Cooks River at Tempe
  • ABC2022-021-22
  • 18 Nov 2022
  • Bridges
The Bridge over Cooks River at Tempe was built in 1960 and designed to carry HS-20 loading. The bridge is on the Princes Highway, a major heavy vehicle route in Sydney. The bridge is currently carrying six marked traffic lanes and with high traffic…
Sydney Gateway Viaduct Design Highlights
Sydney Gateway Stage 3 contains a 550m long Viaduct connecting the upgraded Qantas Drive with Sydney Airport domestic arrival and departure terminals. This paper will give an overview of some of the interesting and less conventional aspects of its…
Bridges of the West Gate Tunnel Project
The West Gate Tunnel Project is one of Australia's largest infrastructure projects currently under construction and will give Melbourne an alternative to the West Gate Bridge. The scope includes: Two three-lane road tunnels, Widening of the West…
Monash Freeway Upgrade - Forster Road Bridge Widening
The $761 million Monash Freeway Upgrade Stage 2 involves the addition of 36 kilometres of new lanes to one of Melbourneís busiest freeways. As part of the project, eight of the existing bridges required widening. While each of the bridges had its…
Bridge Strengthening Design and Construction - Dynon Road Bridge over Moonee Ponds Creek, West Melbourne
The Dynon Road Bridge over Moonee Ponds Creek is a 12-span, 61 metre long cast in-situ concrete flat-slab bridge constructed in 1941. This art-deco style bridge is heavily trafficked and an important link between Melbourneís western suburbs and the…
Pilot Study to Improve Sustainability of Bridges and Civil Structures
The paper presents a whole life cycle analysis of bridges and civil structures with due consideration of environment and economic aspects. The study is presented considering variables of constituent materials components so as to reduce the…
Embedding sustainability in standards and specifications
The Standards Management Framework provides a consistent, whole of life cycle approach to the way standards are developed, applied, managed, and governed in Transport for NSW (Transport). This framework aims to deliver the appropriate balance of…
Modular bridge expansion joints with integrated seismic fuse-elements
Bridges in seismically active regions must be designed and constructed with special considera- tion of how the structure will respond/perform during an earthquake and immediately afterwards. A key element in such considerations is the expansion…
To Achieve Durable and Sustainable Concrete
Asset owners are interested in the use of durable concrete to maximize design life of their structures and minimize Whole of Life Cost (WOLC) throughout. Similarly, most assets owners nowadays also require their assets to be sustainable and…
Austroads Design and Construction Guidelines for the Delivery of Large Cantilever and Gantry Structures
Over recent years there have been a number of incidents of structural failures of sign and high mast lighting structures across Australia and New Zealand, primarily due to poor design and construction practices. In addition to the obvious…