Publications

Filter
Topic
Publication State
Showing 41 - 50 of 130 Publications
Coating of Concrete
Austroads Technical Specification ATS 5343 sets out the requirements for the application of decorative and protective surface coatings to concrete, including supply and quality of materials, surface preparation, application, relevant testing and…
Supply of Geopolymer Concrete
Austroads Technical Specification 5330 covers the requirements for the supply and delivery of Geopolymer Concrete in strength grades up to 50 MPa for use in the following applications: gutters, kerbing, drainage channels, footpaths, driveways,…
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
Fibre Reinforced Polymer Composite Strengthening
Austroads Technical Specification ATS 5380 sets out the requirements for the strengthening of concrete structures using Fibre Reinforced Polymer Composite (FRPC) strengthening systems, including supply and quality of materials, surface preparation,…
Webinar: Properties of General-purpose Cement with Increased Percentages of Limestone
This webinar, presented on 15 October 2019, provides an overview of an Austroads project that investigated whether cements with elevated limestone content would perform satisfactorily in ambient-cured and precast concretes subjected to aggressive…
Properties of General-purpose Cement with Increased Percentages of Limestone
This report presents the results of a research project commissioned by Austroads to investigate whether the currently used Australian general-purpose (GP) cement which complies with AS 3972, and which may contain up to 7.5% limestone as a mineral…
General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
General Conditions of Contract for Construction - National Capital Works 4 (NCW4) has been developed for use in “construct only” contracts where the principal is a government or semi-government agency.
Webinar: General Conditions of Contract for Construction - National Capital Works 4 (NCW4)
This webinar, presented on 25 July 2019, provides an overview of the new General Conditions of Contract for Construction - National Capital Works 4 (NCW4), released by Austroads and the Australian Procurement and Construction Council (APCC).
Webinar: Geopolymer Concrete and its Applications
This webinar, presented on 1 May 2018, outlines the findings of an Austroads geopolymer concrete project and a current update of the use, monitoring and specification of geopolymer concrete by VicRoads over the past nine years. The webinar was…
Guide to Bridge Technology Part 6: Bridge Construction
To ensure that bridges are properly constructed in accordance with the design drawings and specifications, engineers need to be well-informed on all aspects of their design and construction, including awareness of the problems that may arise and the…