Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Asset Management
Bridges
Corporate
Economics and Financing
Environment
Materials
Pavement
Tunnels
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
34
Corporate Reports
1
Research Reports
6
Technical Reports
1
Webinars
3
Webinars and Events
1
Topic
Topic
Active travel
77
Aggregates
62
Annual reports
61
Asphalt
174
Automated vehicle policy
64
Automated vehicle safety
73
Bicycles
99
Binders
112
Binders test methods
73
Bitumen
117
Bituminous mixes test methods
77
Bridge assessment
136
Bridge components
104
Bridge construction
190
Bridge design
297
Bridge maintenance
150
Bridge management
157
Bridge materials
162
Bridge performance
112
Bridgeworks specifications
94
Capability assessment
59
Cemented materials
60
Climate change
Community attitudes
59
Concrete
128
Congestion
62
Contracts
57
Cooperative ITS
77
Crash analysis
102
Data management
118
Design principles and process
73
Digital infrastructure
56
Drainage
60
Driver licensing
84
Drugs and alcohol
60
Economic evaluation
100
Electric vehicles
59
Equipment test methods
72
Financing
64
Freight modelling
61
Freight policy
77
Geometric design
78
Granular materials
69
Guide review
83
Heavy vehicle access
118
Heavy vehicle safety
93
Heavy vehicle weighing
63
Incident management
64
Intelligent transport systems
75
Intersection design
75
Land use
57
Level of service
69
Materials testing
184
Motorcycles
57
Network management
93
Network operations
74
Network performance
66
Older drivers
58
Other assets management
66
Pavement construction
75
Pavement design
207
Pavement investigation test methods
68
Pavement maintenance
89
Pavement management
146
Pavement performance
279
Pavements specifications
71
Pedestrians
100
Performance based standards
62
Process and documentation
60
Procurement
58
Project governance
58
Project planning
67
Public transport
71
Rail bridges
Recycled material
78
Road pricing
56
Roadside design
67
Rural and remote
77
Safe people
108
Safe roads
156
Safe System
99
Safe vehicles
91
Safety audit
60
Safety strategy
73
Seals
133
Speed management
95
Steel
74
Strategic asset management
94
Structures management
79
Temporary traffic management
70
Traffic and safety
62
Traffic controls
88
Traffic management
101
Traffic modelling
68
Traffic operations
69
Traffic theories and studies
60
Transport planning
70
Tunnel design
65
Tunnel operations
60
Tunnel safety
66
Year
Year
2023
3
2022
3
2017
15
2014
9
2012
1
2011
10
2010
2
2004
2
2000
1
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 31 - 40 of 46 Publications
Climate change
Remove Climate change filter
Rail bridges
Remove Rail bridges filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Carbon and Asphalt: A Review of Environmental Factors Including Emission Calculators
AP-R416-12
10 Oct 2012
Pavement
More
This report provides input to the Austroads project Performance of Warm Mix Asphalt Pavements. It involves a literature review of existing CO2-e emission calculators applicable to road construction (using asphalt products) with a view to…
Peninsula Link: Frankston Stony Point Railway Bridge
ABC-DES024-11
31 Oct 2011
Bridges
More
The Frankston Stony Point Rail Bridge crosses over the Peninsula Link Freeway, located on Victoria’s Mornington Peninsula. In this location the Frankston Stony Point rail line comprises a single bi-directional broad gauge track carrying regional…
High Level Bridge - Extending the Useful Life of Heritage Bridges
ABC-MHB001-11
31 Oct 2011
Bridges
More
Described as being 'one of the finest pieces of architectural iron-work in the world', the High Level Bridge in the UK recently underwent a major programme of investigation, assessment, strengthening and refurbishment. Constructed in 1849, the two-…
Seaford Rail Viaduct - Launching a Kilometre
ABC-DES036-11
31 Oct 2011
Bridges
More
The Seaford Rail Extension Project, currently under construction to the south of Adelaide, South Australia, requires a 1.125km long viaduct to cross the Onkaparinga Valley and River. The solution chosen is an incrementally launched, concrete box…
Strengthening of the West Gate Bridge Concrete Viaducts
ABC-MAR024-11
31 Oct 2011
Bridges
More
The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 850 m long cable stayed steel box girder main span section. The key objective with the West Gate…
Fatigue and Maintenance Aspects of a Welded Steel Truss Railway Bridge
ABC-MAR023-11
31 Oct 2011
Bridges
More
The main structural components of the railway bridge at Bankstown, installed in January 2011, are two 18m steel welded arch trusses with an overall height of 3.5m. Each truss comprises fabricated box sections for the chords and I sections for the…
Sydney Harbour Bridge - Replacement Rail Track Support
ABC-MAR021-11
31 Oct 2011
Bridges
More
The existing rail track support on the Sydney Harbour Bridge consists of timber transoms and deck supported on steel stringers and cross-girders of the Bridge. The deck area of the Bridge is solid except in the rail corridor. Not having a solid deck…
Building and Maintaining Bridges to be Sustainable
ABC-WPD005-11
31 Oct 2011
Bridges
More
One of the hottest discussed topics in the international engineering community at present is sustainability of infrastructure with respect to global warming and climate change. Global warming and climate change could result in frequent extreme…
Lifting the Future of Bridges
ABC-WPD009-11
31 Oct 2011
Bridges
More
Whether you believe sea levels will rise in the future due to global warming or not, can bridges be easily designed to accommodate changing sea levels? This paper describes how a bridge on New Zealand’s state highway network has been designed with…
The Development and use of Systems for the Integration of Sustainability into the Project Lifecycle for Highway and Railway Bridge Design
ABC-AMM007-11
31 Oct 2011
Bridges
More
The East Coast Main Line (ECML) is one of the busiest and most successful railway lines in the United Kingdom and it is challenged with improving efficiency for passenger and freight services to meet future demands for low carbon transportation. A…
Prev
2
3
4
5
Next
Latest news
21 May 2024
New report details findings of survey of medical practices and practitioners
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No