Publications

Filter
Topic
Publication State
Showing 21 - 30 of 109 Publications
Cementitious Patch Repair of Concrete
Austroads Technical Specification 5340 sets out the requirements for the patch repair of defective concrete using cementitious materials. The process of restoring existing concrete typically includes: breaking back to sound and dense concrete to…
Fibre Reinforced Polymer Composite Strengthening
Austroads Technical Specification ATS 5380 sets out the requirements for the strengthening of concrete structures using Fibre Reinforced Polymer Composite (FRPC) strengthening systems, including supply and quality of materials, surface preparation,…
Supply of Steel Reinforced Precast Concrete Pipes
This Austroads Technical Specification ATS 2210 sets out the requirements for the supply and delivery of steel reinforced precast concrete pipes used for stormwater / drainage purposes. It excludes: concrete pipes subject to internal pressure…
Webinar: Properties of General-purpose Cement with Increased Percentages of Limestone
This webinar, presented on 15 October 2019, provides an overview of an Austroads project that investigated whether cements with elevated limestone content would perform satisfactorily in ambient-cured and precast concretes subjected to aggressive…
Properties of General-purpose Cement with Increased Percentages of Limestone
This report presents the results of a research project commissioned by Austroads to investigate whether the currently used Australian general-purpose (GP) cement which complies with AS 3972, and which may contain up to 7.5% limestone as a mineral…
Calibration of Bitumen Sprayers: General Introduction and List of Methods
This test method provides an overview of the 
Calibration of Bitumen Sprayers: Volumetric Calibration of Bitumen Pumping Systems
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: 
Viscosity of Calibration Fluid
This test method sets out the procedure for validating the calibration fluid. The calibration fluid is used for volumetric calibration of bitumen sprayer pumps (AGPT/T531), and also for two methods of determining transverse distribution of bitumen…
Calibration of Bitumen Sprayers: Transverse Distribution by Fixed Pit Facility
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: general introduction and list of methods. It sets out the procedures for determining the transverse distribution of bitumen sprayers, and is based on…
Calibration of Bitumen Sprayers: Transverse Distribution by Field Mat
This test method is for bitumen sprayers as specified in AGPT/T530 Calibration of bitumen sprayers: general introduction and list of methods. It sets out the procedures for determining the transverse distribution of bitumen sprayers, and is based on…