Operational and Inventory Management of Bridges
Theoretical assessments of a bridge network to AS5100.7 identify many bridges operating at margins smaller than those embodied in AS 5100.7. The cost of strengthening these bridges is unpalatable and the consequences of restricting access are…
2017 Revision of Australian Standard AS 5100 Part 1: Scope and General
AS 5100 is the only Australian standard specific to bridges. For the first time, the scope has been extended from primarily a structural design standard to include other bridge related topics including safety-in-design, climate change and…
AS(AS/NZS) 5100 - 2017: Rail Bridge Design and Ratings - Key Changes
The revision of AS(AS/NZS) 5100 series has resulted in key changes to the provisions for train braking loads, dynamic load allowance, train collision loads, bridge bearings and design for light rail bridges. Longitudinal rail force provisions have…
Bridge Inspection Audit an Effective Tool for Asset management
Roads and Maritime Services, New South Wales is responsible for managing over 5600 bridges and bridge size culverts, with a written down value of 12.5 billion and a replacement cost of 18.2 billion. Roads and Maritime bridge stock is the oldest and…
A Rail Bridge in Twenty Days: The Torrens To Torrens North:South Corridor Upgrade
The Torrens Road to Torrens River (T2T) project forms part of the overall North-South Road Corridor upgrade in Adelaide, South Australia and incorporates many components such as a new lowered motorway, road, service and pedestrian bridges, retaining…
Replacement Of Four Long Bridges In Fiji Islands
Four bridges in the Fiji Islands were recently replaced using a Design and Construction procurement method for the Fiji Road Authority. The bridges provided vehicle, pedestrian and Fiji Sugar Corporation cane trains over waterways subjected to…
Epping To Thornleigh Third Tracking (Ettt) Project - M2 Bridge Alternative Design, Sydney
The existing rail lines at this location sit on a marginally stable embankment of 1.5:1 slope and height varying between 6m to 15m. The existing lines cross the M2 motorway via an under-bridge and Devlin’s creek via an old masonry arch culvert.
Network Importance of Melbourne's Metropolitan Bridges: Development of a Strategic Bridge Prioritisation Framework
VicRoads manages a network of some 1,700 bridges across metropolitan Melbourne. Many of these bridges are critical for the safe operation of the transport network which provides for the movement of passenger and freight vehicles and public transport…
Bridge Condition Inspections Using Unmanned Aerial Vehicles: A Trial Project
VicRoads manages a significant number of structures where access for inspection is difficult due to height, length and the obstacle being crossed
Weather Resistant Steel As Viable Option For Country Timber Bridge Replacements
Steel in bridge construction in Australia has declined significantly over the last 40 years from around 25% of bridges to as low as 5% of bridges in recent years. The main reasons for this have been the proliferation of precast prestressed concrete…