Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
32
Topic
Topic
Active travel
65
Aggregates
48
Annual reports
47
Asphalt
161
Automated vehicle policy
50
Automated vehicle safety
59
Bicycles
86
Binders
98
Binders test methods
59
Bitumen
104
Bituminous mixes test methods
63
Bridge assessment
122
Bridge components
90
Bridge construction
176
Bridge design
284
Bridge maintenance
136
Bridge management
145
Bridge materials
148
Bridge performance
98
Bridgeworks specifications
80
Capability assessment
45
Cemented materials
46
Climate change
46
Community attitudes
45
Concrete
114
Congestion
48
Contracts
43
Cooperative ITS
63
Crash analysis
88
Data management
106
Design principles and process
59
Digital infrastructure
42
Drainage
47
Driver licensing
71
Drugs and alcohol
46
Economic evaluation
88
Electric vehicles
46
Equipment test methods
58
Financing
50
Freight modelling
48
Freight policy
64
Geometric design
64
Granular materials
55
Guide review
71
Heavy vehicle access
106
Heavy vehicle safety
80
Heavy vehicle weighing
49
Incident management
50
Intelligent transport systems
61
Intersection design
61
Land use
43
Level of service
55
Materials testing
170
Motorcycles
43
Network management
80
Network operations
61
Network performance
52
Older drivers
44
Other assets management
52
Pavement construction
61
Pavement design
194
Pavement investigation test methods
54
Pavement maintenance
76
Pavement management
134
Pavement performance
269
Pavements specifications
57
Pedestrians
88
Performance based standards
48
Process and documentation
46
Procurement
44
Project governance
44
Project planning
53
Public transport
57
Rail bridges
Recycled material
65
Road pricing
42
Roadside design
54
Rural and remote
63
Safe people
95
Safe roads
144
Safe System
86
Safe vehicles
77
Safety audit
47
Safety strategy
59
Seals
120
Speed management
81
Steel
60
Strategic asset management
81
Structures management
66
Temporary traffic management
56
Traffic and safety
48
Traffic controls
74
Traffic management
87
Traffic modelling
54
Traffic operations
55
Traffic theories and studies
46
Transport planning
56
Tunnel design
53
Tunnel operations
48
Tunnel safety
54
Year
Year
2017
15
2014
9
2011
8
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 11 - 20 of 32 Publications
Rail bridges
Remove Rail bridges filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Constructability and Practical Design: Victoria Park Drive, Elizabeth Quay Vehicle Bridge and Fremantle Rail Bridge Protection, WA
ABC2017-078-17
21 Apr 2017
Bridges
More
Bridge engineers must develop design solutions that can be safely constructed and maintained. With technical skill, vision and collaboration we produce solutions that surprise and delight, accommodate complex ground conditions and geometries,…
Restoration of the Kimberley Rail Bridge
ABC2017-023-17
20 Apr 2017
Bridges
More
Kimberley Rail Bridge, which spans the Mersey River in Tasmania, is one of the critical pieces of rail infrastructures on TasRail’s freight network. The heritage listed bridge was severely damaged during what has been considered as one of Tasmania’s…
AS(NZS)5100 -2017: Derailed Train Collisions - Leading Safety
ABC2017-045-17
20 Apr 2017
Bridges
More
Safety in design provisions to prevent high loss of life and bridge collapse resulting from train derailments for both rail underbridges and overpasses have been subject to much debate in the recent past. Whilst these events are rare they can happen…
Precast Segmental Box Girder Design and Construction within a Constrained Rail Corridor
ABC2017-033-17
20 Apr 2017
Bridges
More
The Level Crossing Removal Project: Caulfield to Dandenong involves the removal of nine of Melbourne’s most congested level crossings along the Caulfield to Dandenong rail corridor. Grade separation of the four level crossings between Caulfield and…
Rail Structure Interaction For Multiple Span Railway Viaducts With Direct Fixed Track
ABC2017-001-17
20 Apr 2017
Bridges
More
Rail Structure Interaction (RSI) is a complex phenomenon in rail bridges which involves a detailed study and effects of the forces transmitted between rail and deck and subsequently to substructure due to train loadings, temperature and time-…
Review of AS 5100.2: Design Loads
ABC-AUS102-14
22 Oct 2014
Bridges
More
AS 5100, the Australian Bridge Design Code, is currently under review. AS 5100.2, Design Loads, sets out the minimum design loads, forces and load effect for road, railway, pedestrian and bicycle bridges and other associated structures.The review of…
Improving Victoriaâs Rail Network Through Innovative Structural Design
ABC-DES601-14
22 Oct 2014
Bridges
More
The Regional Rail Link is a $4.8 billion, joint Commonwealth and Victorian Government funded infrastructure project designed to remove major bottlenecks in Victorias rail network by separating regional and metropolitan trains as they travel from…
Regional Rail Link Deer Park to West Werribee Junction, Road Bridges, Victoria
ABC-DES101-14
22 Oct 2014
Bridges
More
The Regional Rail Link (RRL) project is Victorias largest rail infrastructure project providing 47.5 km of new dual railway tracks for dedicated V/Line regional rail services between Southern Cross Station and West Werribee Junction via Sunshine…
Fatigue-Detailing of Skewed Steel Through-Girder Rail Bridges: Regional Rail Project, Melbourne
ABC-DES102-14
22 Oct 2014
Bridges
More
The south-west of Melbourne has experienced huge residential development, and a corresponding increase in rail patronage. The Regional Rail Project effected the separation of Regional and Metropolitan lines between Southern Cross Station, and…
Review of AS 5100.1: Scope and General Principles
ABC-AUS101-14
22 Oct 2014
Bridges
More
AS 5100, the Australian Bridge Design Code, is currently under review. AS 5100.1, Scope and General Principles, sets out the requirements for the design of new bridges, using limit states principles for bridges associated with roads, rail, tramways,…
Prev
1
2
3
4
Next
Latest news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
6 May 2024
Congratulations to Madeleine McManus OAM on receiving 2024 John Shaw Medal
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No