Skip navigation
Open main navigation
Open/Close Search bar
Search
View Cart
Drivers & Vehicles
Toggle
Drivers & Vehicles
This section includes managing drivers with health risks, requirements for visiting drivers, NEVDIS, and the introduction of connected and automated vehicles to Australasia.
Assessing Fitness to Drive
Vehicles and Technology
NEVDIS
Overseas Drivers
Registration and Licensing
Road Safety & Design
Toggle
Road Safety & Design
This section covers safety barrier assessments, and the work of the Road Safety Task Force and Road Design Task Force.
Barrier Assessment
Road Safety
Road Design
Safety Hardware Training and Accreditation Scheme (ASHTAS)
Transport Operations
Toggle
Transport Operations
In this section you'll find information about our work to improve the efficient, reliable and safe operation of the road network for all road users.
Network Operations
Traffic Management
Temporary Traffic Management
Freight
Active Travel
Transport Infrastructure
Toggle
Transport Infrastructure
This section includes information about strategic asset management, the management of bridges, pavements and tunnels, project delivery and the national prequalification system.
Asset Management
Bridges
National Prequalification
Pavements
Project Delivery
Road Tunnels
Technical Specifications
About
Contact
News
Events
Projects
Publications
Tenders
Login
Home
Publications
Publications
Share
Subject area
All
Bridges
Search publications library
Filter
Open/Close All Filters
Type
Type
Conference Papers
32
Topic
Topic
Active travel
65
Aggregates
48
Annual reports
47
Asphalt
161
Automated vehicle policy
50
Automated vehicle safety
59
Bicycles
86
Binders
98
Binders test methods
59
Bitumen
104
Bituminous mixes test methods
63
Bridge assessment
122
Bridge components
90
Bridge construction
176
Bridge design
284
Bridge maintenance
136
Bridge management
145
Bridge materials
148
Bridge performance
98
Bridgeworks specifications
80
Capability assessment
45
Cemented materials
46
Climate change
46
Community attitudes
45
Concrete
114
Congestion
48
Contracts
43
Cooperative ITS
63
Crash analysis
88
Data management
106
Design principles and process
59
Digital infrastructure
42
Drainage
47
Driver licensing
71
Drugs and alcohol
46
Economic evaluation
88
Electric vehicles
46
Equipment test methods
58
Financing
50
Freight modelling
48
Freight policy
64
Geometric design
64
Granular materials
55
Guide review
71
Heavy vehicle access
106
Heavy vehicle safety
80
Heavy vehicle weighing
49
Incident management
50
Intelligent transport systems
61
Intersection design
61
Land use
43
Level of service
55
Materials testing
170
Motorcycles
43
Network management
80
Network operations
61
Network performance
52
Older drivers
44
Other assets management
52
Pavement construction
61
Pavement design
194
Pavement investigation test methods
54
Pavement maintenance
76
Pavement management
134
Pavement performance
269
Pavements specifications
57
Pedestrians
88
Performance based standards
48
Process and documentation
46
Procurement
44
Project governance
44
Project planning
53
Public transport
57
Rail bridges
Recycled material
65
Road pricing
42
Roadside design
54
Rural and remote
63
Safe people
95
Safe roads
144
Safe System
86
Safe vehicles
77
Safety audit
47
Safety strategy
59
Seals
120
Speed management
81
Steel
60
Strategic asset management
81
Structures management
66
Temporary traffic management
56
Traffic and safety
48
Traffic controls
74
Traffic management
87
Traffic modelling
54
Traffic operations
55
Traffic theories and studies
46
Transport planning
56
Tunnel design
53
Tunnel operations
48
Tunnel safety
54
Year
Year
2017
15
2014
9
2011
8
Publication State
Publication State
Live
Sort by:
Relevance
Date (Newest first)
Date (Oldest first)
Title (A-Z)
Title (Z-A)
Publication Code (A-Z)
Publication Code (Z-A)
Showing 21 - 30 of 32 Publications
Rail bridges
Remove Rail bridges filter
Live
Remove Live filter
Clear all filters
Clear all filters
Fully-matching results
Rangiriri Rail Bridges, New Zealand
ABC-DES303-14
22 Oct 2014
Bridges
More
As part of the ongoing upgrade of timber-piled bridges on the North Island Main Trunk, KiwiRail identified three bridges (BR 280, 281, 282) to be replaced in 2012. These bridges all cross streams of 16 m to 42 m in width and provide a ballast deck…
Life Extension of Aging Railway Bridges: A Case Study of the Burnett River Bridge
ABC-AAI402-14
22 Oct 2014
Bridges
More
The North Coast Rail Line in Queensland between Bundaberg and Gladstone has three major crossings over the Burnett, Kolan and Boyne Rivers. The bridges were constructed in the 1890s using cast iron piers and through-girder spans. Queensland Rail…
Rail Bridges for the Richlands to Springfield Project
ABC-DES302-14
22 Oct 2014
Bridges
More
In February 2011, the Queensland Government announced that the TrackStar Alliance would construct the $475 million Stage 2 Richlands to Springfield project as part of the broader Darra to Springfield Transport Corridor. The alliance consisted of…
Metro Train Melbourne Bridge Renewal Works: Victoria Street and Langridge Street Bridge Replacement
ABC-DES304-14
22 Oct 2014
Bridges
More
The replacement of the aging railway bridges in the existing railway network will always result in disruption to rail operation and inconvenience to the commuting public. The construction time has also been a major constraint to the design, and so…
Peninsula Link: Frankston Stony Point Railway Bridge
ABC-DES024-11
31 Oct 2011
Bridges
More
The Frankston Stony Point Rail Bridge crosses over the Peninsula Link Freeway, located on Victoria’s Mornington Peninsula. In this location the Frankston Stony Point rail line comprises a single bi-directional broad gauge track carrying regional…
High Level Bridge - Extending the Useful Life of Heritage Bridges
ABC-MHB001-11
31 Oct 2011
Bridges
More
Described as being 'one of the finest pieces of architectural iron-work in the world', the High Level Bridge in the UK recently underwent a major programme of investigation, assessment, strengthening and refurbishment. Constructed in 1849, the two-…
Seaford Rail Viaduct - Launching a Kilometre
ABC-DES036-11
31 Oct 2011
Bridges
More
The Seaford Rail Extension Project, currently under construction to the south of Adelaide, South Australia, requires a 1.125km long viaduct to cross the Onkaparinga Valley and River. The solution chosen is an incrementally launched, concrete box…
Strengthening of the West Gate Bridge Concrete Viaducts
ABC-MAR024-11
31 Oct 2011
Bridges
More
The 2.5km long West Gate Bridge comprises an eastern and western concrete approach viaduct, 871m and 670m respectively in length either side of the 850 m long cable stayed steel box girder main span section. The key objective with the West Gate…
Fatigue and Maintenance Aspects of a Welded Steel Truss Railway Bridge
ABC-MAR023-11
31 Oct 2011
Bridges
More
The main structural components of the railway bridge at Bankstown, installed in January 2011, are two 18m steel welded arch trusses with an overall height of 3.5m. Each truss comprises fabricated box sections for the chords and I sections for the…
Sydney Harbour Bridge - Replacement Rail Track Support
ABC-MAR021-11
31 Oct 2011
Bridges
More
The existing rail track support on the Sydney Harbour Bridge consists of timber transoms and deck supported on steel stringers and cross-girders of the Bridge. The deck area of the Bridge is solid except in the rail corridor. Not having a solid deck…
Prev
1
2
3
4
Next
Latest news
13 May 2024
Austroads and AfPA update bituminous binder sampling practice guidelines
9 May 2024
Neil Scales honoured with Austroads Medal for transformational leadership
6 May 2024
Congratulations to Madeleine McManus OAM on receiving 2024 John Shaw Medal
Sign up for our monthly newsletter RoadWatch Roundup
Name
Email
Hide Feedback button
Feedback
Close
Feedback form
Name
Email
Repeat email address
Telephone
What type of feedback would you like to leave?
Select…
Compliment
Complaint
Suggestion
Feedback text area...
Would you like a response?
Yes
No